Download Print this page

CDI 123-9800 Installation And Troubleshooting Manual page 2

Advertisement

1.4 Ω
Set Meter
to Ohms - Ω
Step 2-
Step 1-
Measure circuit
Disconnect all wires
from the coil and
resistance between
Gray and Violet wire
measure it's resistance.
Installation and Troubleshooting Guide
All rights reserved. Reproduction or use of content, in any manner, without express written permission by CDI Electronics, Inc., is prohibited
3.0 Ω
Set Meter
Ballast Resistor Required
to Ohms - Ω
3 Ohms – Step 2 reading =
(See Table for Selection)
See Diagram below
Step 3-
Calculate how much
ballast resistance to
add.
Coil
Resistor
Ohms
Required
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Page - 2 of 2
.
Ballast
Ballast
Resistor
Selection
CDI Part #
2.6
2.5
121-BR50-2.5
2.5
2.5
121-BR50-2.5
2.4
2.5
121-BR50-2.5
2.3
2.5
121-BR50-2.5
2.2
2.5
121-BR50-2.5
2.1
2
121-BR50-2
2.0
2
121-BR50-2
1.9
2
121-BR50-2
1.8
2
121-BR50-2
1.7
2
121-BR50-2
1.6
1.5
121-BR50-1.5
1.5
1.5
121-BR50-1.5
1.4
1.5
121-BR50-1.5
1.3
1.5
121-BR50-1.5
1.2
1.5
121-BR50-1.5
1.1
1.5
121-BR50-1.5
1.0
1.5
121-BR50-1.5
QF-319

Advertisement

loading