2. Create a small void in the ballast between sleepers and slide the VoidMate under the rail. 3. Ensure the VoidMate base is flush under the rail. 4. Slide clamp over the foot of the rail. The bracket should sit on the foot of the rail as shown.
Page 2
2. Fully unscrew sensor plug. 3. Loosen sensor clamp and detach from VoidMate. 4. Loosen and open the end clamp. 5. Remove the Voidmate. 11. The VoidMate will continuously stream information via Platform Interactive. CONTACT DETAILS Head Office +44 (0) 161 797 5511 Datum House info@datummonitoring.com...