I N S T
L L
T I O N I N S T R U C T I O N S
Installation Instruction No.: 1 009 489R2 – Updated May 2012
Products Covered: CCBBS, CCBBS-OG, CCBBSCTC L, CCBBSBTC L
C UTION: Do not operate resurfacing equipment over top of covers. This may result in damage to the surface finish of the product.
C UTION: Box has no post pour adjustment.
C UTION: For polished concrete floors, make sure "U" shaped spacer is installed prior to pouring the concrete.
NOTE: When using a floor covering over concrete, CCBBS is only designed for use with a 1/4" [6.4mm] thick floor covering.
1. Locate and position floor box in accordance
with floor plans or blueprint.
15 1/4"
[387mm]
3. Remove mudcap to access the electrical and data
compartments.
19 1/8"
[486mm]
Polished Concrete
Floor Spacer: Spacer
must be installed prior
to pouring concrete.
For carpet applications
remove mud cap,
discard spacer ring and
replace mud cap.
Legrand/Wiremold electrical systems conform to and should be
properly grounded in compliance with requirements of the current
National Electrical Code or codes administered by local authorities.
ll electrical products may present a possible shock or fire
hazard if improperly installed or used. Legrand/Wiremold electrical
products may bear the mark as UL Listed and/or Classified and
should be installed in conformance with current local and/or the
National Electrical Code.
IMPORT NT: Please read all instructions
before beginning.
2. Level the floor Box, then:
For carpet installation: Remove "U" shaped spacer
(See Step 3) under mudcap. lign the top surface of
the concrete with the top surface of the floor box.
For polished concrete floor installation: Leave "U"
shaped spacer (See Step 3) in place. lign the top
surface of the concrete floor with the top of the sheet
metal mud cap.
nchor the floor box: fter the box has been leveled,
use screws, nails, or wire to secure box into position and
prevent box from floating during the pour.
C UTION: Do not dislodge or shift box with
job site traffic or concrete vibrations.
4. Remove electrical and data panels. Remove knockouts
where required. ttach conduits for power and data
cables using UL Listed components. ll openings and
unused knockouts must be closed or sealed off during
final installation.

Advertisement

loading
Need help?

Need help?

Do you have a question about the CCBBS and is the answer not in the manual?

Questions and answers

Summary of Contents for LEGRAND CCBBS

  • Page 1 C UTION: For polished concrete floors, make sure “U” shaped spacer is installed prior to pouring the concrete. NOTE: When using a floor covering over concrete, CCBBS is only designed for use with a 1/4" [6.4mm] thick floor covering. 2. Level the floor Box, then: 1.
  • Page 2 7. Remove mudcap. 8. Determine required location and mount divider, Cat No. CCBBS-DIV on device bracket. 10. Locate and pull wires and cables. 9. If tunnels are to be used, remove tunnel by removing (2) #8-32 screws. Remove the spacer plate located behind...
  • Page 3 12. Determine device plates selection based on sizes illustrated below. 7/8" [22mm] SP CER PL TE – RFB119-SP CER DIVIDER KIT – CCBBS-DIV Used to close off space adjacent Front Plate is the same size as to standard plates when used on RFB119-SP CER Spacer Plate.