Download Print this page

ZURN QHPM-2S Operating Instructions Manual

Advertisement

Quick Links

QHPM Stainless Steel
Heating Manifold
Operating Instructions

Advertisement

loading
Need help?

Need help?

Do you have a question about the QHPM-2S and is the answer not in the manual?

Questions and answers

Summary of Contents for ZURN QHPM-2S

  • Page 1 QHPM Stainless Steel Heating Manifold Operating Instructions...
  • Page 2: Specifications

    Specifications Product Code QHPM-2S 8" [203] 11.68" [296.5] 1.96" [50] 4.13" [105] 3.31" [84] 5.35" [136] QHPM-3S 8" [203] 13.65" [346.5] 1.96" [50] 4.13" [105] 3.31" [84] 5.35" [136] QHPM-4S 8" [203] 15.61" [396.5] 1.96" [50] 4.13" [105] 3.31" [84] 5.35"...
  • Page 3: Technical Data

    Specifications Product Code Size Circuits Connections QHPM-2S 1" Inlet 3/4" QHPM-3S 1" Inlet 3/4" QHPM-4S 1" Inlet 3/4" QHPM-5S 1" Inlet 3/4" QHPM-6S 1" Inlet 3/4" QHPM-7S 1" Inlet 3/4" QHPM-8S 1" Inlet 3/4" QHPM-9S 1" Inlet 3/4" QHPM-10S 1" Inlet 3/4"...
  • Page 4 Connecting The Heating Circuits Attach the tubing to the appropriate Using the spanner, tighten the circuit and header. compression nut. Repeat procedure for all remaining circuits.
  • Page 5: Sample Configuration

    Sample Configuration Typical manifold piping configuration example:...
  • Page 6 Flow Meter Adjustment And Operation Flow meter before Remove the set ring. To increase flow, turn adjustment. the flow meter counter clockwise. To decrease flow, turn flow Reattach the set ring. Repeat procedure for all meter clockwise. remaining flow meters.
  • Page 8 ZURN PEX , INC. ® HIGHWAY 11 EAST COMMERCE, TX, USA 75428 PHONE: 855-ONE-ZURN (855-663-9876), FAX: 1-800-209-2148 In Canada: ZURN INDUSTRIES LIMITED 3544 NASHUA DRIVE, MISSISSAUGA, ONTARIO L4V 1L2 PHONE: 905-405-8272, FA X: 905-405-1292 www.zurn.com Form No. ZMKTG370-65, Rev. 10/12...

This manual is also suitable for:

Qhpm-3sQhpm-4sQhpm-5sQhpm-6sQhpm-7sQhpm-8s ... Show all