Power Setting - Lake Lite LL-SPL-8 series Instructions

Solar piling lite 8"
Table of Contents

Advertisement

SOLAR PILING LITE – 8"
MODEL: LL-SPL-8-X-X
Top Screws
Top
Silicone Pad
Battery Cover
Cover Screws
Lens
Base
1
Use the provided wrench to separate your light:
The battery is not connected when shipped.
Power Level / OFF Button
3
Look inside the light to see a small push button in order to
select power level or on/off position.
3.2v
LiFePo4
3000mA
Battery
2
Connect Battery: Caution! When plugging battery connectors
together, align notches before joining both connectors.
Forcing or connecting backwards will damage the light.

Power Setting

100%
80%
60%
40%
20%
OFF
4
PO BOX 414
Phone: 260-918-2758
105 W. Simon St.
Fax:
Laotto, IN 46763
E-mail sales@lakelite.com
MALE NOTCH
3.2v LiFePo4
3000mA
Battery
* Note: Run times will vary significantly based on factors such
as; Sun Exposure, Season, Geographic Location, Shading,
Installed Location/Position, Battery Condition, Brightness
Setting, etc... The following run times should only be used as a
general reference and are not guaranteed. Consider your local
environment.
260-918-3540
FEMALE NOTCH
* Run Times
6-8 hrs
7-9 hrs
10-12 hrs
13-15hrs
16-20 hrs
OFF
www.lakelite.com
www.solarpilinglites.com

Advertisement

Table of Contents
loading

Table of Contents