PPE Stage 3 Installation Manual

PPE Stage 3 Installation Manual

Tie rod assemblies, 2001-2010 gm 2500/3500hd trucks 158031500 2011 plus gm 2500/3500hd trucks 158031511

Advertisement

Stage3 Tie Rod Assemblies
PPEdiesel.com
3
S
tage
Tie Rod
Assemblies
2001-2010 GM 2500/3500HD Trucks (158031500)
2011+ GM 2500/3500HD Trucks (158031511)
Technical Support (714) 985-4825
Rev:06/19/18 v4A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Stage 3 and is the answer not in the manual?

Questions and answers

Summary of Contents for PPE Stage 3

  • Page 1 Stage3 Tie Rod Assemblies PPEdiesel.com tage Tie Rod Assemblies 2001-2010 GM 2500/3500HD Trucks (158031500) 2011+ GM 2500/3500HD Trucks (158031511) Installation Guide Technical Support (714) 985-4825 Rev:06/19/18 v4A...
  • Page 2 Stage3 Tie Rod Assemblies Lock nut Tie Rod Ball Stud Grease fitting Maintenance Instructions Adjustment to eliminate end-play Remove set screws (2) Use pliers to secure here ------------------- Tighten inner face -------- Apply Loctite to set screws Reinstall set screws 1 1/8”...
  • Page 3 Measure length on removed tie rod from inner face to the center of the grease fitting. Step 6: Using measurement from Step 5, adjust the length of the new PPE Tie Rod assembly to match the length of the old assembly. Step 7: Tighten Jam Nut to lock length using a 1 1/8”...
  • Page 4 DISCLAIMER OF LIABILITY This agreement sets forth the terms and conditions for the use of this product. The installation of this product indicates that the Buyer has read and understands this agreement and accepts the terms and conditions. Pacific Performance Engineering Inc., its distributors, employees, and dealers (the “Seller”) shall not be responsible for the product’s proper use and service.

Table of Contents