Download Print this page

Advertisement

Quick Links

Jumpstone
Call us +44 ( 0 ) 131 214 1180
www.inclusiveplay.com
Jumpstone – Installation manual

Advertisement

loading

Summary of Contents for Inclusive Play Jumpstone

  • Page 1 Jumpstone Call us +44 ( 0 ) 131 214 1180 www.inclusiveplay.com Jumpstone – Installation manual...
  • Page 2: Before Installation

    Single Minimal 150 cm 1. Check using the part list if all parts are supplied correctly. 2.Determine the place of the Jumpstone. Take into account Obstacle free zone that there are no obstacles in the obstacle free zone. See picture.
  • Page 3: Installation

    Installation Select the desired installation method for your application. For questions please contact your supplier. PERMANENT PERMANENT PREFAB Jumpstone – Installation manual...
  • Page 4 Add potting soil Cast for instalation One can in itself determine the amount of potting soil and with it the weight of the 0 mm foundation (at least 64 liters potting soil) - 350 mm Jumpstone – Installation manual...
  • Page 5 Add potting soil for installation Dig a hole of 650 x 350 and 350 mm deep. Set Install the Jumpstone mounting frame the mounting frame above the hole and fill it such as the top part is equal and with potting soil. Make sure the mounting frame horizontal with the ground.
  • Page 6 Add potting soil for installation Remove all M10 bolts ont he outside of the Lift the outside hood and the rubbet tile. Jumpstone and remove the service hatch. Place the Jumpstone on the mounting frame. Jumpstone – Installation manual...
  • Page 7 Confirm 4x M10 bolts at the marked holes indicated above in the mounting frame. Mount in reverse direction. See previous page. Jumpstone – Installation manual...
  • Page 8 Installation using prefab concrete block PERMANENT PREFAB - Great for in tile plateau (300x300mm); - Easy installation based on prefab concrete block 0 mm - 350 mm Jumpstone – Installation manual...
  • Page 9 350 mm 350 mm Install the concrete block in such a way Dig a hole of at least 350 x 350 mm that the top is equal and horizontal with and 350 mm deep. the ground level. Jumpstone – Installation manual...
  • Page 10 Lift the outside hood and the rubber tile Remove all M10 bolts on the outside of the from the Jumpstone and place the Jumpstone. Remove the service hatch. Jumpstone on the mouting frame. Jumpstone – Installation manual...
  • Page 11 Confirm 4x M10 bolts at the marked holes indicated above in the mounting frame. Mount in reverse direction. See previous page. Jumpstone – Installation manual...