Gen II Entree Bath - All Models Installation Manual Important Safety Instructions Read & Follow All Instructions Thoroughly Important safety instructions. Read and follow all instructions thoroughly. CAUTION: The caution heading identifies important maintenance and operation information. Failure to obey a caution warning may result in damage to the Entree Bath and may void the warranty.
Page 2
This page is intentionally left blank 2071 14 Ave – Columbus, NE 68601 06-23-17 800-798-5867 FAX: 402-563-9102 Page 3 of 11 www.mastercarebath.com...
Two people will now be required to lift the crate over the top of the Entree Bath. d. Set aside the Entree Gen II Starter Kit box and the Combo Case from the pallet. It is recommended to leave the stretch wrap (plastic) on the Entree Bath until the tub is in its final location.
Page 9
IMPORTANT: IMMEDIATELY UPON RECEIPT, CHECK FOR VISIBLE FREIGHT DAMAGE. IF DAMAGE IS FOUND, IT MUST BE REPORTED, COMMUNICATED AND DOCUMENTED IMMEDIATELY TO THE FREIGHT COMPANY AND MASTERCARE. REMOVE 2 SCREWS FROM COVER PANEL 2071 14 Ave – Columbus, NE 68601...
Generation II Entree Bath – All Models INSTALLATION MANUAL Flush line into a bucket and verify hot water comes from that hose. After flushing, attach tub hose with red marking. Make sure the screen is in the hose. Connect a flexible hose to the hot water supply valve. Flush hose into a bucket and verify cold water comes from hose.
Page 11
Tighten the hose clamps on the rubber couplers. Anchor the tub to the wall in two places with the anchor kit provided in the Entree Gen II Starter Kit box. Select the two stud locations as far apart as possible along the rear wall flange of the tub. Center on each stud using the finishing washer in the kit and hold it just below the black trim seal to mark the anchor hole location.
Page 12
Generation II Entree Bath – All Models INSTALLATION MANUAL PLUMBING & ELECTRICAL ROUGH-IN INFORMATION, TUB ANCHORING INFORMATION WALL & ALCOVE INSTALLATION. WALL TUB 120V-AC, 60 Hz, 20 amp, SERVICE 32" (Center Line 2X4 ELECTRICAL BOX WITH DUPLEX for STD Tubs) RECEPTACLE FLUSH MOUNTED IN WALL (GFCI already installed on tub) 35"...
Generation II Entree Bath – All Models INSTALLATION MANUAL PENINSULA INSTALLATION ON BOARD GFCI LOCATED UNDER 3/4" HOT & COLD SERVICES AT THESE THIS PANEL LOCATIONS WITH 3/4" BALL VALVES FOR A TOTAL OF 12" ABOVE THE FLOOR WITH VALVE HANDLES LOCATED AS SHOWN 3"...
Generation II Entree Bath – All Models INSTALLATION MANUAL ISLAND AND PENINSULA PLACEMENT CONFIGURATION Dimensions listed here are actual tub dimensions, not space requirements. 1. Wall Placement MB-68-AV 36” D x 65 ½” W x 46 ½” H MB-68-AV (XL) 36” D x 71 ½” W x 46 ½” H 5.
Need help?
Do you have a question about the Entree Gen II and is the answer not in the manual?
Questions and answers