Proper installation of this EarthLinked
performance. All EarthLinked
technician who has successfully completed the training class and passed the final examination.
Installation must be made in accordance with the instructions set forth in this manual and the
®
EarthLinked
Commercial Water Heating System Installation, Operation and Maintenance Manual.
Failure to provide installation by an authorized, trained installer in a manner consistent with these
manuals will void and nullify the limited warranty coverage for the system.
EarthLinked Technologies shall not be liable for any defect, unsatisfactory performance, damage or
loss, whether direct or consequential, relative to the design, manufacture, construction, application
or installation of the field specified components.
info@earthlinked.com ●
FM KIT 04/09
EarthLinked
Flowmeter Kit
(FMK-1872)
Installation Manual
CONTENTS
Pre-Installation
Flowmeter Kit Parts
Flowmeter Assembly
Final Piping Assembly
Flowmeter Operation and Maintenance
Disclaimer
®
Kit is essential to the EarthLinked
®
systems and kits must be installed by an authorized, trained
EarthLinked Technologies, Inc.
4151 South Pipkin Road
Lakeland, Florida 33811
tel. 863-701-0096 ● fax 863-701-7796
®
PAGE
®
www.earthlinked.com
Copyright 2009 EarthLinked Technologies, Inc.
1
1
2
2
5
system's reliable