Every effort has been made to supply information within this manual which is correct. Wallgate Limited will not be liable for any damage or loss that arises if the person installing, operating or maintaining the unit has not read or not complied with the manual In any event, and without prejudice to any warranties in Wallgate Limited’s terms and...
Product Manual ALB-01, 03 & 05 2. Conventions Certain conventions are used in this manual to make it easier to read and understand. They are given in the sections below. 2.1. Warning A warning with white text on a red background is used to give information about hazards that can cause injury or death.
The ALB bath can also be operated by IR sensor or pneumatic push button control. The moulded bath fits into a frame that is available as an option from Wallgate and is supplied with external panels (bath and panels available in a choice of colour).
✓ 1 off Bath panels with fixing screws (Note panels supplied will vary according to bath model). o Model ALB-01 includes two side panels & one end panel. o Model ALB-03 includes one side panel & one end panel. o Model ALB-05 includes one side panel.
Product Manual ALB-01, 03 & 05 1. Ensure product fixings are correctly fitted as detailed in the following instructions. 2. Ensure all fixings are tightened to the recommended torque as detailed in the following instructions. 3. Seal the edges of the product to the wall and floor. Fill gaps between the bath...
Page 9
Product Manual ALB-01, 03 & 05 NOTE: Due to space limitations between underside of bath & floor, a floor cavity or opening for the waste trap may be required, see Figure 3, DETAIL ‘F’. WARNING! The bath alone weighs approx. 70Kg. Always use safe lifting procedures when lifting heavy loads.
NOTE: Fit a service isolating tap on the feed to each solenoid. This allows easy maintenance when required. The isolating tap is not supplied by Wallgate. NOTE: Pipe sealing compound should be avoided. If it is used, it should be used sparingly.
Page 13
Product Manual ALB-01, 03 & 05 NOTE: Ensure when cutting copper pipes to fit into push fit connectors the tube is cut with a suitable rotary pipe cutter, to ensure it is burr free and the tube end is slightly chamfered to avoid damage to the rubber seal on the push fit connectors.
Page 14
Product Manual ALB-01, 03 & 05 Figure 4, Solenoid & Control unit installation & connection. Revision 3...
3. If a thermostatic mixer valve (TMV3) (Not supplied by Wallgate Ltd) is fitted to the plumbing system for the hot outlet, you may have to adjust the valve to set the correct hot water temperature.
Any service or repair work must be done by a qualified engineer. During the warranty period, the service or repair must only be done by a Wallgate engineer or appointed service agent. Refer to the Wallgate terms and conditions for warranty information.
Product Manual ALB-01, 03 & 05 6.2. Maintenance General wear mainly affects the components in contact with water. If the unit is installed in a hard water area, lime scale removers must be used on the bath and water nozzle components.