dosatron IPK34-14 GPM Assembly Instructions

Industrial plumbing kit for units: dosatron d14mz2, dosatron d14mz5, dosatron d14mz10, dosatron d14mz3000

Advertisement

For quick priming (helpful at low water flows):
Shut off outlet ball valve
Insert injection hose into the chemical container
Turn on the stainless steel ball valve (collect discharged
solution or send it to drain)
Observe the injection hose. When full, count 10 clicks
Shut off stainless steel ball valve
Turn outlet ball valve on

For sample collection:

Make sure the unit is primed
Shut off outlet ball valve
Turn stainless steel ball valve on
In a clean container, collect 2.5 gallons of diluted solution
Shut off stainless steel ball valve
Collect sample out of the 2.5 gallons and check
concentration
Turn on the outlet valve
2090 Sunnydale Blvd.
727-443-5404
Clearwater, FL 33765
800-523-8499
2015-02 LA
2011-140-GEN23_14 GPM
ASSEMBLY INSTRUCTIONS
IPK34 - 14 GPM
Industrial Plumbing Kit
For units: D14MZ2, D14MZ5, D14MZ10, D14MZ3000
Dosatron unit sold separately.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IPK34-14 GPM and is the answer not in the manual?

Questions and answers

Summary of Contents for dosatron IPK34-14 GPM

  • Page 1 Shut off stainless steel ball valve  Collect sample out of the 2.5 gallons and check concentration  Turn on the outlet valve 2090 Sunnydale Blvd.  Clearwater, FL 33765 800-523-8499 727-443-5404   Dosatron unit sold separately. 2015-02 LA 2011-140-GEN23_14 GPM...
  • Page 2 Roll of Teflon tape Instruction card Zip tie When connecting a DOSATRON either to the public water supply or to its own water source, you must respect the regulations in force concerning protection of the source i.e. backflow prevention, etc.

This manual is also suitable for:

Ipk34-10 gpm

Table of Contents