Chatsworth Products Evolution Installation Instructions

Vertical cable managers

Advertisement

Quick Links

Safety Information
WARNING: Product is heavy. Use two people to lift.
WARNING: Do not lift product by plastic fingers.
WARNING: Product not designed for stand-alone use. Support
product properly until bolted to rack. Do not leave unsupported
product unattended.
WARNING: Make sure door pins engage completely when
installing door.
Intended Use
Install this vertical cable manager (VCM) only in a restricted service environment,
such as a data center. Use indoors only, in environmentally controlled areas; do
not use outdoors, in harsh environments or in air-handling spaces. Use this VCM
to house copper and fiber data communications cabling. Allow only qualified
service personnel to use this VCM.
Packaged Hardware
QTY
DESCRIPTION
8
½-20 x 1 Bolts
8
½ Washers
8
½-20 Hex Nuts
2
¼-20 x ¾ Hex Cap Screws (not required for Evolution VCM)
2
¼-20 Hex Nuts (not required for Evolution VCM)
Installation Instructions
®
Evolution
Vertical Cable Managers
IIS-735511, 01/06/10, Rev. 2, CPI/J Garza
800-834-4969 (USA & Canada) • www.chatsworth.com • techsupport@chatsworth.com
For international phone numbers, see our website or contact CPI Tech Support.
This drawing contains proprietary and confidential information and is protected by U.S. and international law. Unauthorized
reproduction, disclosure or use of the drawing or the information therein is expressly forbidden except as agreed to in writing
by Chatsworth Products, Inc.
Page 1 of 5

Advertisement

loading

Summary of Contents for Chatsworth Products Evolution

  • Page 1 ½-20 x 1 Bolts ½ Washers ½-20 Hex Nuts ¼-20 x ¾ Hex Cap Screws (not required for Evolution VCM) ¼-20 Hex Nuts (not required for Evolution VCM) IIS-735511, 01/06/10, Rev. 2, CPI/J Garza 800-834-4969 (USA & Canada) • www.chatsworth.com • techsupport@chatsworth.com For international phone numbers, see our website or contact CPI Tech Support.
  • Page 2: Mounting Instructions

    Installation Instructions ® Evolution Vertical Cable Managers MOUNTING INSTRUCTIONS 1. Stand the Vertical Cable Manager (VCM) and position it next to the rack as shown in FIGURE 1. 2. The VCM must be contacting the floor when installed. 3. For the Double Sided VCM, align with rack using the front mounting holes to bias the manager towards the rear as shown in DETAIL A.
  • Page 3: Door Installation

    The door attaches to the VCM using four hinge mechanisms operated by the knobs on the front of the door. The Evolution g1 Single Sided Vertical Cable Manager uses only the front door. The Evolution g2 Double Sided Vertical Cable Manager uses a front and rear door.
  • Page 4: Door Operation

    Installation Instructions ® Evolution Vertical Cable Managers DOOR OPERATION 1. Closed: All knobs point vertically. 2. Left Hinging: Rotate right knob inward to open door as shown in DETAIL D. 3. Right Hinging: Rotate left knob inward to open door as shown in DETAIL E.
  • Page 5 10-16 x ¾ Thread Panel Shown Cutting Screw NOTE: Cable Spool Kit not to be used with 6 inch wide configurations of Evolution VCM. For easier installation, attach Lashing Bar and Fiber Segregation accessories before Cable Spool Kit. Cable Spool...