Download Print this page

Samba 130-1413 Assembly Instructions

Goal 6ft x 4ft locking (183cm x 122cm)

Advertisement

Quick Links

Assembly Instructions and Safety Procedures
BG Sports International Ltd (T/a Samba Sports) Walton St, Colne, Lancs, BB8 0EN
Tel: 01282 860077 Fax: 01282 860033
Email:
info@sambasports.co.uk
Assembly sequence: (See overleaf for images)
• Always check the goal post and net for defects before use and
replace damaged parts.
• It is recommended that the goal is assembled by an adult.
• Assemble the base first.
• Fit the uprights.
• Assemble the crossbar.
• Fit the crossbar.
• Assemble the tension bars, 2 item 7's and 1 item 9.
• Fit the tension bar assembly to the goal. IT IS IMPORTANT that
the tension bar is fitted to the top of the goal first then bend
down and fit in the large hole in the base.
• Fit the net by wrapping the net round the tube and clipping on
the inside. Coloured cord to the TOP of the goal.
• Ensure the posts are upright and the crossbar is level before
securing to the ground with the anchors.
Website: www.sambasports.co.uk
Samba Goal 6ft x 4ft
Locking
(183cm x 122cm)

Advertisement

loading

Summary of Contents for Samba 130-1413

  • Page 1 Coloured cord to the TOP of the goal. • Ensure the posts are upright and the crossbar is level before securing to the ground with the anchors. BG Sports International Ltd (T/a Samba Sports) Walton St, Colne, Lancs, BB8 0EN Tel: 01282 860077 Fax: 01282 860033 Email: info@sambasports.co.uk...
  • Page 2 Please note: Not all goals are supplied with coloured corners and connectors Safety Procedures Safety: • Always check the goal post and net for defects before use and replace damaged parts. • Do not use the goal with faulty parts. •...