FRENZY 205HB Assembly Instructions

Advertisement

Available languages

Available languages

FRENZY 205HB

Assembly instructions.

(1.)
Secure the scooter with both hands, then pull the locking sleeve out of the guide block,
holding the locking sleeve in place, lift bars to their upright position.
(2.)
Once handle bars have been lifted to their upright position, release the locking sleeve.
Be sure to check that the sleeve has locked into the guide block grooves, securing the
scooter bars in the upright position.
(3.)
Unclip the handle bars from the folded position and insert the handle into the T-section
of teh handle bars. Press the metal button to insert fully and rotate the bar until the
button locks into the corresponding hole. There should be no movement once locked.
(4.)
Release the clamp on the upright bar and lift to elevate the handle bars to the desired
position. Three di erent heights can be secured by pressing the metal button and
continuing to lift the bars.
(5.)
Once the desired height has been achieved, ensure the metal button has locked into
one of the holes on the upright bar before tightening the clamp again.
(6.)
Finally, when you have con rmed the height is correct and noted the ball button has
locked into place, pull the clamp leaver shut to lock the bars securely. If the clamp is not
tight enough turn bolt attached the clamp when the leaver is open to tighten.
Always ensure that adjustable parts are locked rmly in place before use!
(!)
(!!)
To Fold away for carrying, follow the above steps in reverse order; always ensure handle
bar grips are clipped into holder when removed from T-section.
(1.)
(4.)
(2.)
(5.)
(3.)
(6.)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 205HB and is the answer not in the manual?

Questions and answers

Summary of Contents for FRENZY 205HB

  • Page 1: Assembly Instructions

    FRENZY 205HB Assembly instructions. (1.) Secure the scooter with both hands, then pull the locking sleeve out of the guide block, holding the locking sleeve in place, lift bars to their upright position. (2.) Once handle bars have been lifted to their upright position, release the locking sleeve.
  • Page 2 FRENZY 205HB Aufbauanleitung. (1.) Halte den Scooter mit beiden Händen fest. Ziehe dann die Verschlussmanschette nach oben aus der Führung und halte sie fest, um den Lenker aufzurichten. (2.) Lasse die Verschlussmanschette zurückfahren, sobald der Lenker aufgerichtet ist. Versichere Dich, dass die Manschette sicher eingerastet ist, damit der Lenker vollständig aufgerichtet ist.

Table of Contents