Sentinel Installation and Setup Guide
SOlaR OPeRatiOn
To operate the unit from a solar power system, disconnect the external power supply from the Vin ter-
minals on the Cellular Battery Backup Controller. Next, connect the output of the solar voltage regulator
to the Vin terminals. (See specifications for requirements)
SPecificatiOnS
Power Input Voltage: 11.5 - 20 VDC (Vin terminal on Cellular Battery Backup Controller)
Power Input Current: 350mA nominal/650mA peak
Battery Backup (Cellular): 12V 3.4 AH sealed lead-acid rechargeable
Enclosure Dimensions: 14" x 12" x 7.4"
Weight: 12 Lbs.
Operating Temperature: 0° to 135°F (-18 to 57°C)
4
Need help?
Do you have a question about the Sentinel PRO and is the answer not in the manual?
Questions and answers