4 ft x 8 ft sidemate - v2 vinyl garden shed (50 pages)
Summary of Contents for DuraMax DS108
Page 1
A L L P U R P O S E M E T A L S T O R A G E S H E D S Metal Garden Shed OWNER’S MANUAL / Instructions for Assembly Size 10’ x 8’ with “Extension Kits” Ver: 1.2 Customer Service Hotline...
Duramax Storage Shed Limited Fifteen Year Warranty U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of fifteen years from the date of purchase. This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered.
Parts List Note: Check all parts prior to installation. ACCESSORIES CODE DESCRIPTION CODE DESCRIPTION PROFILES BOT TOM SLIDER BASE BAR BACK LEFT BASE BAR DOOR HANDLE BACK RIGHT BS1A BASE BAR FL ASHING END CAP SIDE FRONT LEFT / BACK RIGHT BS2A BASE BAR TOP CORNER...
Page 5
One Extension Parts List Note: Check all parts prior to installation. ACCESSORIES PROFILES CODE DESCRIPTION CODE DESCRIPTION EBS1 BASE BAR SIDE PL ASTIC WASHER EXTENSION LEFT PL ASTIC SCREW COVER EBS2 BASE BAR SIDE EXTENSION RIGHT EAS1 TOP ANGLE SIDE WEATHER STRIPPING TAPE 1.5 MTR.
Page 6
Exploded View with One Extension ERFC ERFS RP3A RP2A ERFS ERS1 ERS2 EAS1 EAS2 EBS1 EBS2 Left Door Right Door IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
The following are a list of lumber and sizes you will need. DuraMax must be installed on a level wooden platform or a level concrete foundation. Pressure Treated - Wood Studs: Wooden platform is extra and 2ea 2”...
Page 8
. Assemble base bar back left (BLA) and base bar back right (BRA) with four (S1) screws. See fig. 1 & 2. Note Take care of sharp edges. Fig.1 Fig.2 EBS1 . Assemble the base bar side (BS1A), (BS2A) and extension (EBS1) together with (S1) screws. See fig.
Page 9
. Place the base bar assembly on top of the foundation. Use (S2) screws to fix the assembly to foundation. Left Back Front Right . Place the base bar side assembly on left side. Insert the edge of (EBS1) into the back base bar (BLA) and secure with (S1) screws.
Page 10
. Place the base bar (BBF) on top of the base bar side on both side. Secure with (S1) screws on both corners. See fig. 1 & 2. BS2A Fig.2 Fig.1 . Using the carpenter square, line up the corners. Secure the base (BBF) to the foundation with (S2) screws.
Page 11
. Measure in all direction as shown in figure. Make the base bar assembly in a perfect square. Concrete foundation . (Concrete foundation) Using a carpenter’s square, line up corners. Align Base bars, mark the concrete at the holes in the base and drill concrete with 1/4”...
Page 12
. Place the wall panel corner front (WCF) on the base bar (BS2A). Line up the holes with base bar and use (S1) screws with washers to Secure. Make sure the overlapping Note position is same as shown in fig.1. BS1A BS2A BS2A...
Page 13
. Insert the 2 pieces of (TS) Top slider into the sliding channel. See blowup. Note Make sure the position of the projection on (TS) towards inside. Front . Place the wall panel (WFL) on the base bar (BBF) front left side of the shed. Line up the holes with base bar.
Page 14
. Use (S3) bolt and nut with washer to join together the wall panels. . Place the sliding channel left (SLA) on top of the wall panel (WFL) from inside. See the position in fig1. Line up the holes with wall panel use (S1) screws with washers to fix.
Page 15
. Place the sliding channel support (SSA) in between the sliding Channels (SLA)& (SRA). Align the holes with sliding channel and secure with (S1) 1 & 2 screws. See fig. 1 & 2. Fig.2 Fig.1 . Place the wall panel corner back (WCB) on the base bar (EBS1).
Page 16
. Place the top angle back left (ABLA) on top of the wall panel (WS) from inside. See the position in fig.1. Line up the holes with wall panel. Use (S1) screws with washers to fix. See fig. 2. ABLA ABLA ABLA Fig.2...
Page 17
. Place the wall panel (WS) on top of the base bar and overlap with corner panel (WCF). Secure the wall panel to top angle and base bar with (S1) screws with washers. Use (S3) bolt & nut with washer to join together the middle of the wall panels.
Page 18
. Place the wall panel (WS) on the base bar and overlap with corner panel (WCB) and (WS). Secure wall panel to top angle and base bar with (S1) screws with washers. Use (S3) bolt & nut with washer to join together the middle of the wall panels.
Page 19
. Place the wall panel (WS) on the base bar (BRA). Line up the holes with the base bar and use (S1) screws with washers to secure. See fig. 2. Use (S3) nut and bolt with washer to join together the middle of the wall panel.
Page 20
. Assemble the top angle side (AS2A), (AS1A) and (EAS2) together with (S1) screws. See fig. 1 & 2. Add one (EAS2) for each extension. AS2A AS1A AS1A AS2A AS1A EAS2 EAS2 Fig.2 Fig.1 . Place the assembled top angle on the wall panel. Line up the holes and secure with (S1) screws with washers .
Page 21
. Place the wall panel (WS) on top of the base bar and line up the holes. Secure with (S1) screws with washers. Use (S3) bolt and nut with washer to join together in the middle of the wall panel. See fig. 2. Note Make sure the overlapping position is same as...
Page 22
. Continue to place the wall panel and secure with (S1) screws with washers. See fig. 1. Use (S3) bolt and nut with washer to join together the middle of the wall panel. See fig. 2. Fig.2 Fig.1 . Follow the same way as item No. 31. Make sure the overlapping Note position is same as...
Page 23
. Secure the door column with (S1) screws. Repeat the same for the right column (DCR). . Place the sliding channel cover (SCA) on top of the sliding (SRA) and secure with (S1) screws. . Place the sliding channel cover (SCA) on top of the sliding (SLA) and secure with (S1) screws.
C. Roof Note All parts are clearly marked and care should be taken to use the correct one. Parts Needed: (2) Gable panel front left / back right (GPLA) Roof flashing front right / back left (RF1A) (2) Gable panel front right / back left (GPRA) Roof flashing front left / back right (RF2A)
Page 25
Note Remove the Polyethylene Film before start assembling. . Place the Gable panel (GPRA) on top of the sliding channel (SRA). See fig.1. Push the Gable panel inside the top angle side (AS2A). See fig.2. Align the holes with sliding channel and secure with (S1) screws from GPRA inside.
Page 26
. Place the Gable panel (GPRA) & (GPLA) on top of the Top angle (ABLA) & (ABRA). See fig. 1. Insert the Gable Panel into the Top angle side (EAS1) & GPRA (EAS2). Align the holes with Top angle and secure with (S1) screws.
Page 27
. Assemble roof structure one end with roof support RS1A bracket (SB2B) using (S3) bolt and nut. See fig. 1 & 2. RS1A Fix the other end also with roof support bracket (SB1A). Make sure the taper side on Note roof structure must be up.
Page 28
. Assemble roof structure one end with roof support bracket (SB1A) using (S3) bolt and nut. See fig. 1 & 2. Fix the other end also with roof support bracket (SB2A). Make sure the taper side on Note roof structure must be up. RS2A SB2A Taper side...
Page 29
. Fix assemble the roof structure into the gable panels (GPLA) (GPRA) alin the holes between roof support bracket (SB1A) & (SB2A) And Gable panel secure with bolt with plastic washer and nut (S3). see fig. ERS1 Make sure the taper Note RS2A side on roof structure...
Page 30
. Place the roof panel (RP4A) on top of the Gable panel (GPRA). Line up the holes with Gable panel and secure with (S3) bolt and nut with washers. RP4A RP4A GPRA . Line up the holes with roof structure and top angle side and secure with (S1) screws with washers.
Page 31
. Place the roof panel (RP2A) on the roof structure and secure with (S1) screws with washers. Make sure the overlapping Note position for roof panel is as shown in blowup. RP2A RP2A RP3A RP3A . Place the roof panel (RP2A) on the roof structure and secure with (S1) screws with washers.
Page 32
. Place the roof panel (RP4A) on top of Gable panel and roof structure. Use (S3) bolt and nut with washers for Gable panel and use (S1) screws with washers to RP4A secure with roof structure and top angle side. .
Page 33
. Place the roof panel (RP2A) on the roof structure and secure with (S1) screws with washers. Make sure the overlapping Note position for roof panel is as shown in blowup. RP3A RP2A RP3A RP2A . Place the roof panel (RP1A) and secure with (S3) bolt and nut with washers to Gable panel and use (S1) screws with washers to the roof structure.
Page 34
EFRS . Assemble the roof flashing (RFSA) & (EFRS) with roof panel. Secure with (S1) screws with washers. RFSA Add two (EFRS) for each extension. Make sure the overlapping Note position for roof flashing is RFSA EFRS as shown in blowup. RFSA RFSA RFSA...
Page 35
. Slide the flashing end cap to the front and back top of the roof and secure with (S1) screws with washers. See fig. 1 & 2. RFCA Fig.1 Fig.2 . Place the top corner (TC) on the roof flashing joint and secure with (S2) screws.
Page 36
. Insert the ventilation cover (VC) into the back Gable panel and secure with (S1) screws. Back IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
D. Door Parts Needed: (1) Door panel left (DPL1A) (1) Door panel left (DPL2A) (1) Door panel right (DPR1A) (1) Door panel right (DPR2A) (2) Door panel strips side left and right (DSS) (1) Door panel strip top left (TSLA) (1) Door panel strip top right (TSRA) (1) Door panel strip bottom left...
Right Door Assembly . Assemble the door panel (DPR1A) & (DPR2A) together with (S3) bolt and nut from inside. Note Remove the Polyethylene Film before assembling. DPR1A DPR2A DPR1A DPR2A . Assemble the door panel strip side (DSS) to the door panel (DPR2A) from inside.
Page 39
. Assemble the door panel strip (TSRA) with door panel. Make sure the door panel top edge to be inserted into the (TSRA). See fig.1. Secure the (TSRA) with (DSS) and door panel with TSRA (S1) screws. See fig. 2. 1 &...
Page 40
. Assemble the bottom slider (BS) to the door panel bottom side at both edge with (S3) bolt and nut with washers. . Fix the door handle (DH) with door panel from front side with bolt and nut. IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
Page 41
Left Door Assembly . Assemble the door panel (DPL1A) & (DPL2A) together with (S3) bolt and nut from inside. Note Remove the Polyethylene Film before assembling. DPL2A DPL1A DPL1A DPL2A . Assemble the door panel strip side (DSS) to the door panel (DPL2A) from inside.
Page 42
. Assemble the door panel strip (TSLA) with door panel. Make sure the door panel top edge to be inserted into the (TSLA). See fig. 1. TSLA Secure the (TSLA) with (DSS) and door panel with 1 & 2 (S1) screws. See fig. 2. Use (S3) bolt and nut with washers to secure with door panel at the middle of (TSLA).
Page 43
. Assemble the bottom slider (BS) to the door panel bottom side at both edge with (S3) bolt and nut with washers. . Fix the door handle (DH) with door panel from front side with bolt and nut. IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
Page 44
. Slide the door panel assembly into the base bar front (BBF). Make sure the bottom slider (BS) should slide inside the base bar front. See fig.1. Fix the door panel top to the top slider (TS) with (S1) screws. See fig.2 & 3 Fig.1 Fig.2 Fig.3...
Page 45
PART 2: Adding Extension Kit to Existing Shed Back Front Remove the top cove (TC) from back side of the shed. Remove the flashing end cap (FC) from front and back side.
Page 46
Remove the roof flashing center (RFCA). As shown. RFCA RFSA Remove Weather Stripping Tape (WST) upto the edge of center pannel (RP2A) (RP3A) & Remove the roof flashing (RFSA) from side. see fig. RFSA RFSA Remove the roof panel (RP4A) & (RP1A) from backside.
Page 47
Support the roof structure (RS1A) & (RS2A) by using an appropriate support to avoid the roof structure from collapsing. Support not included. Note SUPPORT Remove the roof structure (RS1A) & (RS2A) from the roof support bracket. RS2A RFSA RS1A RS2A RS1A Remove the roof structure from Gable panel.
Page 48
Detach the Gable panel left and right from the top angle (ABLA) & (ABRA). Detach the back side wall panel from base bar and top angle. Remove the side wall panel (WCB) from the base bar and top angle.
Page 49
Remove the side wall panel (WCB) from the base bar and top angle. Remove the base bar assembly (BLA) & (BRA) from foundation. Come back to 10’ x 8’ Extension Kit manual (PART 1) and follow the steps accordingly.
Need help?
Do you have a question about the DS108 and is the answer not in the manual?
Questions and answers