Download Print this page

Advertisement

Quick Links

Quick Start Guide
Version M1.0

Advertisement

loading
Need help?

Need help?

Do you have a question about the Mini and is the answer not in the manual?

Questions and answers

Summary of Contents for JetChill Mini

  • Page 1 Quick Start Guide Version M1.0...
  • Page 2 JETCHILL PRODUCT SPEC - Mini Machine SPECIFICATIONS: Operation: Manual Material: Delrin Body, Steel Cover, Steel/Brass/Aluminium internal components Size: 20cm x 15 x 5 (8" x 6" x 2") Total Weight: 2kg (4.4 lb) Nipple Locates inside Glass safety chamber Probe...
  • Page 3 JETCHILL PRODUCT SPEC - Mini Machine Product Spec Image British Standard BS 341 Part 1 No. 8 CYLINDER HOSE (Universal) USA CGA 320 POWER SUPPLY 100-240V 2.5A (Universal) CYLINDER STRAP 1M (3.3ft) Velcro CYLINDER HOSE 25mm (0.98”) CONNECTION 15mm (0.59”) WRENCH &...
  • Page 4 JETCHILL PRODUCT SPEC - Cocktail Glass SPECIFICATIONS: Material: Food grade polycarbonate (Wonderlite 110) Size: 19cm x 4 x 5 (7.5” x 1.6” x 2.0”) Volume: 200ml (7 oz) Total Weight: 50g (0.04lb) Warning: Not for use with Dry Ice pellets...
  • Page 5 JETCHILL PRODUCT SPEC – Shot-Tail Glass SPECIFICATIONS: Operation: Manual screw cap Material: Food grade polycarbonate (Wonderlite 110) Size: 19cm x 4 x 4 (7.5” x 1.6” x 1.6”) Volume: 125ml (4 oz) Total Weight: 80g (0.18lb) Warning: Not for use with Dry Ice pellets...
  • Page 6 JETCHILL PRODUCT SPEC - Shot Glass SPECIFICATIONS: Material: Food grade polycarbonate (Wonderlite 110) Size: 9cm x 4 x 4 (3.5” x 1.6” x 1.6”) Volume: 50ml (2 oz) Total Weight: 20g (0.04lb) Warning: Not for use with Dry Ice pellets...
  • Page 7 Ensure black Rubber O Ring/white Plastic Washer is on the Cylinder End of the Cylinder Hose • Replacement O Rings/Washers supplied in Tool Kit, contact JetChill for additional replacements STEP 2 • Hand screw UK Cylinder Hose clockwise tight, onto Cylinder of Food Grade Liquid Co2 (with Dip Tube) •...
  • Page 8 QUICK START GUIDE – STEP 5 • Place one dry JetChill Glass on Machine Probe and ensure Glass locates correctly on Probe Nipple • Hold Glass in place and press and hold Charge Button once to prime Gas through Machine STEP 6 •...
  • Page 9 QUICK START GUIDE – Post Use STEP 9 • To change Cylinder or at end of session use, close Cylinder Valve by hand turning valve 90 degrees clockwise STEP 10 • Press and hold Charge Button to purge Gas through Machine STEP 11 •...