• Items Included 1. Serial Cable 2. USB Cable 3. Power Cable 4. Four Button Remote 5. OLED 52mm Display 6. DM-100 Control Box 7. User Guide and CD...
Page 3
• Step One Find and connect to 12-18v power source (as shown below in picture) Tip: Find a power source that shuts off with ignition. DO NOT POWER UP IN TILL INSTALL IS COMPLETE...
Page 4
• Step Two Connect (figure two) into HDD serial port. Tip: Carefully route the HDD cable. Making sure it does not rub or chafe.
Page 5
• Step Three Connect 4 Button Remote to Remote input. Tip: One 4 button remote can operate multiple DM-100’s when the other DM-100’s are set to slave...
Page 6
Connecting SM-Modules to the DM-100 Serial Cable Tip: If you have more sensor modules, simply connect them in between the DM-100 and the Sensor Module. Make sure that any subsequent sensor modules added to the iMFD daisy chain MUST have the termination jumper REMOVED.
Page 7
• Step Five Setting up Sensor Module’s for the DM-100 (SM-AFR as Example) Find screen named Screen then will Screen then will Setup Sensors display display Then start Scan Scanning For Parameter 1 Sensors AFR0 Lam Press Select to change values...
Page 8
• Congratulations! Install is Complete. You may now start setting up your DM-100 Checkout Some of are other iMFD products. www.plxdevices.com 408-745-7591...