Download Print this page
Honeywell LonWorks Quick Start Manual

Honeywell LonWorks Quick Start Manual

Gas detector and interface module
Hide thumbs Also See for LonWorks:

Advertisement

Quick Links

Quick Start Guide
Midas
Gas Detector
®
LonWorks
Interface Module
®
4. Cabling the Interface
i)
Gently pry the clear locking
tab outside of the yellow jacket
on both ends of the cable as
shown.
Ensure yellow jacket has not moved out of
position when inserting to the Midas
or LON
®
Module connectors (clear tab is to rest on top of
the yellow jacket bubble).
Caution: Do not over-extend the tab as damage
may result.
ii)
Bend the cable into 1½ loops
as shown. The two connectors
should be approximately 3 cm
apart. This is to reduce torque
on the installed connector.
iii)
Plug the cable into the Midas
and the Interface as shown.
Loosen the black plastic cable
locker on the bottom of the
Midas. Slide this clamp under
the cable locking tab to
prevent the tab from being
depressed. Tighten the locker.
1. Introduction
The Midas
LonWorks
interface module is
®
®
installed behind the standard Midas
®
gas
detector as shown in Figure 1. Power and
data connections are supplied directly to the
LonWorks
®
interface module. All power and
communication to the Midas
®
unit is provided
via the LonWorks
interface.
®
See reverse side for mounting information
Figure 1
Customer Wiring
5. Install Cartridge
i)
Check the part number and type of sensor
cartridge is correct.
ii)
Check the "activate by" date.
iii)
Remove sensor cartridge from packaging.
iv)
Carefully push the sensor cartridge into
the sensor cartridge chamber until fully
seated.
v)
Lock the sensor cartridge in place using
the tabs on both sides of the sensor
cartridge.
vi)
Confirm that the power switch in the
mounting bracket assembly is in the 'on'
position.
vii)
Refit the unit cover by aligning the slots
either side with the locating tabs on the
mounting bracket assembly.
viii)
Tighten the thumbscrew located on the
front panel.
ix)
Install the supplied RJ-45 cable between
the Midas
and the LonWorks
®
interface.
®
2. Mounting the Interface
®
i)
Unscrew LonWorks
interface top plate.
ii)
Mount the interface and tighten screws.
See mounting template on reverse side.
iii)
Connect 24V DC power and LonWorks
wires to the pluggable connectors. See
wiring diagram on reverse side.
iv)
Clamp the cables in the supplied gland
as shown in Figure 2. A spare gland is
included.
v)
Reinstall top plate on the interface.
Figure 2
6. Configuration
i)
Turn on 24 VDC power.
ii)
Confirm that the Midas
initiates the power
®
up sequence.
iii)
Reset Fault F49 if present.
iv)
Set alarm levels and other parameters as
desired.
v)
Confirm that the Midas IP parameters are at
default values. If changed, the DHCP client
must be set to 'n'. The IP address must be
restored to 169.254.60.47 and the subnet
mask must be restored to 255.255.255.0
For further details please refer to the Midas
ating manual MIDAS-A-001 and LonWorks
Note 1998-0643.
A replacement shielded interconnect cable may be
purchased separately. Order part number MIDAS-
A-040.
®
LonWorks
is a registered trademark of Echelon
Corporation.
3. Mounting the Midas
i)
Loosen thumbscrew on front of Midas
ii)
Remove unit cover.
iii)
Loosen two screws on bottom front of
chassis.
®
iv)
Separate main chassis from mounting
bracket assembly.
v)
Mount the Midas
mounting bracket
®
assembly onto the LonWorks
vi)
Tighten screws.
vii)
Align the PCB at the top rear of the main
chassis with the connector located at the
top of the mounting bracket assembly.
viii)
Slide the main chassis backwards on the
mounting bracket assembly so that the
PCB and connector and tubes engage
simultaneously.
WARNING: DO NOT PUSH ON THE LCD AS
THIS MAY CAUSE DAMAGE.
ix)
Tighten the screws to secure the main
chassis to the mounting bracket assembly.
Contact Us
Find out more
www.honeywellanalytics.com
Customer business center
Americas
Honeywell Analytics
400 Sawgrass Corporate Pkwy
Suite 100
Sunrise, FL 33325
Tel: +1 954 514 2700
Toll free: +1 800 538 0363
Fax: +1 954 514 2784
sales@honeywellanalytics.com
®
oper-
Tech
®
Customer business centre
Europe and the rest of the world
Honeywell Analytics
Wilstrasse 11-U11
CH-8610 Uster
Switzerland
Part No. MIDAS-A-037
Tel: +41 (0)1 943 4300
Issue 2 12.06
Fax: +41 (0)1 943 4398
© 2006 Honeywell Analytics
sales@honeywellanalytics.co.uk
www.honeywell.com
®
®
.
®
interface.

Advertisement

loading

Summary of Contents for Honeywell LonWorks

  • Page 1 LonWorks ® interface module. All power and iii) Connect 24V DC power and LonWorks ® communication to the Midas ® unit is provided Separate main chassis from mounting wires to the pluggable connectors. See via the LonWorks interface.
  • Page 2 Plug 1 and Plug 2 are internally connected in parallel to facilitate wiring in bus topology. LonWorks FT-10 wiring is polarity-insensitive. Lon A and Lon B may be swapped. Clearance needed below Midas for tubing and cables.

This manual is also suitable for:

Midas