Advertisement

Quick Links

PRODUCT MANUAL
CABPAT
OPERATING INSTRUCTIONS
1

Advertisement

Table of Contents
loading

Summary of Contents for CABAC CABPAT

  • Page 1 PRODUCT MANUAL CABPAT OPERATING INSTRUCTIONS...
  • Page 2: Table Of Contents

    PRODUCT MANUAL Contents 1. Important Information ............3 2.
  • Page 3: Important Information

    These operating instructions are intended for the use of adequately trained personnel. The following symbols are used in these operating instructions and on the CABPAT. Caution, risk of electric shock. Indicates instructions must be followed to avoid danger to persons.
  • Page 4 PRODUCT MANUAL Figure 1. CABPAT Front View Figure 2. CABPAT End View...
  • Page 5: Introduction

    PRODUCT MANUAL Introduction The CABPAT is a hand held battery powered unit suitable for carrying out electrical safety checks on: • Class I appliances • Class II appliances • IEC mains leads • Extension leads Overview With reference to Figures 1 and 2.
  • Page 6 PRODUCT MANUAL Power ON/OFF = press and hold the CL I and CL II test buttons simultaneously, CABPAT will power on/off when buttons are released. Note: The unit will automatically switch OFF after approximately 3 minutes if no keys are pressed.
  • Page 7: Performing Tests

    If the Appliance under test has an ON/OFF switch, make sure it is in the ON position. Press the CL I test button to start a Class I test sequence. The CABPAT will now test the continuity of the protective earth.
  • Page 8 CABPAT will display LO LOAD. If the LO LOAd enunciator is displayed, the load presented by the appli- ance may be too small for the CABPAT to detect. In this case, press the CL I test button to continue.
  • Page 9: Testing A Class I Appliance With Leakage

    THE PLUG INTO THE CONNECTOR, doing so may damage the CABPAT. Plug the black test lead into the Earth/Insulation test terminal on the CABPAT end panel. Plug the appliance into the CABPAT front panel test socket. Connect the black test probe to an exposed metal part on the appliance.
  • Page 10 Leakage test. Note: The power switch on the appliance under test must be in the ON position to perform a leakage test. If no appliance is detected the CABPAT will display LO LOAD. The ILEAK icon will flash, press the Leakage button to start a Leakage test.
  • Page 11: Testing A Class Ii Appliance

    CABPAT will display LO LOAD. If the LO LOAd enunciator remains on the display, the load presented by the appliance may be too small for the CABPAT to detect. In this case, press the CL II test button to continue.
  • Page 12: Testing A Class Ii Appliance With Leakage

    DO NOT FORCE THE PLUG INTO THE CONNECTOR, doing so may damage the CABPAT. Plug the black test lead into the Earth/Insulation test terminal on the CABPAT end panel. Plug the appliance into the CABPAT front panel test socket.
  • Page 13 Live/neutral reserved If the LO LOAd enunciator is displayed, the load presented by the appli- ance may be too small for the CABPAT to detect. In this case, press the Leakage button to continue. Note: If the High Load enunciator is displayed, the load presented by the appliance may be too great for the CABPAT and the user should carry out an Insulation test.
  • Page 14: Testing A Mains Cord

    CABPAT. Press the CL I test sequence button. The CABPAT will first test the continuity of the protective earth. If the measured value is greater than 1 ohm a cross is placed next to the RPE enunciator, a FAIL is indicated.
  • Page 15: Testing An Extension Lead

    Plug the supplied 0.5m IEC lead into the IEC socket and into a mains outlet on the extension lead. Plug the mains plug of the extension lead into the front panel mains sock- et on the CABPAT. The extension lead can now be tested in the same manner as an IEC as de- scribed above.
  • Page 16: Test An Epod (Powerboard)

    Procedure A: 1. Plug powerboard lead into mains outlet socket on the CABPAT. 2. Plug IEC Lead into the IEC socket on the top of the CABPAT. 3. Plug the IEC Lead plug into the first socket of the EPOD.
  • Page 17: Test An Epod/Extension Lead With Mov And/Or Rcds

    PRODUCT MANUAL 4. Press the CL I and LKGE buttons simultaneously. The CABPAT an earth test. 5. Repeat step 4 on every socket until the last socket. 6. At the last socket, press the CL I button to do a complete test.
  • Page 18 1. Plug the mains lead into the CABPAT and a mains supply socket. 2. Plug powerboard lead into mains outlet socket on the CABPAT. 3. Plug IEC Lead into the IEC socket on the top of the CABPAT. 4. Plug the IEC Lead plug into the first socket of the EPOD.
  • Page 19 PRODUCT MANUAL 9. The CABPAT will give warning beeps. Press the LKGE button to carry out a leakage and polarity test on the last socket. This completes the sequence for the powerboard test. Note: Construction site EPODs usually have 2 banks of outlet sockets.
  • Page 20: Troubleshooting

    Q The CABPAT shows a ‘HIGH LOAD’ warning. A The appliance under test is greater than 10A, proceeding with the Leakage test may blow the fuse in the CABPAT. It is suggested that the sequence is aborted and a sequence which include an Insulation test be performed.
  • Page 21: Specification

    PRODUCT MANUAL Specification Earth Continuity Display Range 0.01 -19.99 ohms Measuring Range 0.05 – 19.99 ohms Accuracy* ± (5% + 2 digits) Test current 200mA minimum Test voltage 9V nominal *When used with Seaward test lead, Part Number 161A024 Insulation resistance Display Range 0.01 -19.99 Mohms Measuring Range...
  • Page 22: Maintenance

    Any contamination of the battery contacts or compartment should be cleaned with a dry cloth. Note: The CABPAT contains no user serviceable parts. If an Error warn- ing should appear on the display please contact Emona Instruments Ltd for advice.
  • Page 23: Battery Check

    PRODUCT MANUAL Battery Check The CABPAT is powered from a 6 AA cells which are checked before a test is performed. When the battery voltage is low the enunciator is illuminated. The unit will continue to perform within specification for a limited number of tests, dependent upon the type of the batteries fitted.
  • Page 24: Fuse

    PRODUCT MANUAL Fuse The unit is protected by a fuse. If the fuse should blow then the mains tests will not be allowed to start and the CABPAT will indicate that the mains connection is incorrect. Fuse Replacement Before opening the CABPAT ensure that all test leads are disconnected.
  • Page 25: Service And Calibration

    PRODUCT MANUAL Service and Calibration To maintain the specified accuracy of the measurement results, the instrument must be recalibrated at regular intervals by either the manufacturer, Emona Instruments. We recommend a recalibration peri- od of one year. For help or advice on Service and Calibration contact: AUSTRALIA Service Department: Emona Instruments 78...
  • Page 26 PRODUCT MANUAL LOAD MESSAGES Message Reason Solution Lo Load Appliance switch is not engaged Engage the switch (turn it on) (switch in off position) Lo Load Appliance switch is engaged but Insulation test ineffective. Consider doing a requires power to latch leakage test.
  • Page 27 PRODUCT MANUAL TEST SEQUENCE TEST SETTING DESCRIPTION EARTH INSULATION LEAKAGE POLARITY CONTINUITY TEST TEST TEST Class I Earthed Appliance ±200mA 500V CLII Class II Double Insulated 500V Appalance CLI- Lead Power LEAD-IEC or Extension ±200mA 500V Board CLI-Leakage Class I Power-up Test ±200mA 240VAC CLII-Leakage...
  • Page 28 PRODUCT MANUAL TEST SEQUENCE TEST TYPE PRESS ATTACHMENT REQUIRED EXAMPLES & COMMENTS BUTTON(S) Appliance leads (black) connect- 3 pin - Most kitchen appliances ed to exposed mental parts. (toaster, microwave..) CLII Appliance leads (black) connect- Most hand held tools (2 or 3 pin ed to exposed mental parts.

Table of Contents