Steca PA Link1 Installation And Operating Instructions Manual
Steca PA Link1 Installation And Operating Instructions Manual

Steca PA Link1 Installation And Operating Instructions Manual

Parallel switch box

Advertisement

Quick Links

Installation and operating instructions
PA Link1 parallel switch box
EN
756.409 | Z02 | 16.31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PA Link1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Steca PA Link1

  • Page 1 Installation and operating instructions PA Link1 parallel switch box 756.409 | Z02 | 16.31...
  • Page 2: Table Of Contents

    Index Introduction ....................3 About these instructions ................4 Applicability ..................4 Users ....................4 Description of symbols ................. 5 Scope of delivery .................. 5 Safety ......................6 Proper usage ..................6 Other risks ................... 6 Behaviour in the case of faults ............. 6 Exclusion of liability ................
  • Page 3: Introduction

    (-60/-L60) / PI 1500-48 (-60/-L60) stand-alone inverters can be operated in paral- lel with the PA Link1 parallel switch box on 115 V or 230 V (see table below). One stand-alone inverter works as a master, the others as slaves. The PA Link1 has one output for AC consumers (AC OUT).
  • Page 4: About These Instructions

    1.1 Applicability These instructions describe the installation, function, operation and maintenance of the PA Link1 parallel switch box. Further information on operating the battery system is contained in the Steca Solarix PI operating instructions. 1.2 Users These operating instructions are intended for end customers and installers. A techni- cal expert must be consulted in cases of uncertainty.
  • Page 5: Description Of Symbols

    Emphasis on issue at hand issue at hand 1.4 Scope of delivery 1 PA Link1 1 RJ45 cable, red, 0.5 m for Master Solarix PI 1 RJ45 cable, grey, 0.5 m for Solarix PI Slave 1 2 RJ45 cables, grey, 1.0 m for Solarix PI Slave 2 to 3...
  • Page 6: Safety

    Any other use is regarded as improper use of the device. Examples of improper use: • The PA Link1 parallel switch box must never be connected to the public mains grid or a generator. • It is not permitted to operate the PA Link1 parallel switch box without fitted cover of the terminals, without casing, or with a damaged casing.
  • Page 7: Description Of The Connections

    Example layout of a complete system. Representation is schematic. A Solar module B Solar charge controller C Battery D Sine wave inverter Steca Solarix PI E Steca PA Link1 parallel switch box Electric load (230 V AC or 115 V AC) 756.409 | Z02 | 16.31...
  • Page 8: Mounting

    • Minimum clearance of approx. 10 cm above and below to allow free air circu- lation. • Enough clearance for the type plate to be visible on the installed device. 4.1.2 Mounting the PA Link1 parallel switch box Unscrew 2 screws (1) on the cover (2) of the terminals. Lift the cover upwards.
  • Page 9: Connection

    4.2 Connection WARNING Danger of explosion from sparking! Danger of electric shock! The parallel switch box may only be connected to the local consumer devices and the inverters by trained personnel and in accordance with the applicable regulations. Connections must always be made in the sequence described below. The cables pre-fitted to the inverter may not be extended and must not be damaged.
  • Page 10: Function Test

    The cables pre-fitted to the inverters must not be extended. Switch all the inverter rotary switches to the "Off" setting Connect the inverters to the battery in accordance with the Steca Solarix PI operating instructions. The installation of the system is now complete.
  • Page 11: Making Changes To The System

    Operation In parallel operation the power supply is regulated by the rotary switch on the master, see the Steca Solarix PI operating instructions. The rotary switches at the slaves do not have any function. However, they must be in the “Off” position because otherwise the slaves may eventually become operational unintentionally.
  • Page 12: Care, Maintenance And Service

    (setting "Off"). Clean casing surface periodically using a slightly moistened cloth. Do not use solvents. Technical data PA Link1 parallel switch box Operating temperature 0 °C … +50 °C, under continuous load Storage temperature -20 °C … +70 °C Humidity 0 % …...
  • Page 13: Fault Diagnosis And Troubleshooting

    Fault diagnosis and troubleshooting Fault diagnosis and troubleshooting of the individual inverter is described in the Steca Solarix PI operating instructions. Fault Cause Remedy LED on slave does not light up Attention Danger of damage to the inverter. Disconnect the battery and...
  • Page 14: Contact

    Mammostrasse 1 87700 Memmingen Germany +49 8331 8558 833 +49 8331 8558 132 E-Mail service@stecasolar.com Internet www.steca.com PA Link1 parallel switch box Type ......................... Series number ....................Dealer Company ......................Contact person ....................Street ....................... Postcode ......................Town ........................ Telephone number ...................
  • Page 15 ...

Table of Contents