Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
1
Installing the Handle
Parts needed for this procedure:
1
Cable tie
4
Handle bolt
4
Nut (5/16 inch)
2
Slotted-head bolt (#10)
2
Locknut (#10)
Procedure
1. Install the upper handle tubes to the lower handle and
braces using 2 handle bolts and 2 nuts (5/16 inch) on
both sides of the machine
Left side shown
1. Upper handle tube
2. Handle bolt
3. Lower handle
Description
Cable tie
Handle bolt
Nut (5/16 inch)
Slotted-head bolt (#10)
Locknut (#10)
No parts required
(Figure
4).
Figure 4
4. Nut (5/16 inch)
5. Brace
Qty.
1
4
4
2
2
–
2. Secure the throttle cable over the lower handle using a
cable tie
(Figure
1. Operator's Manual tube
2. Clamp (2)
3. Throttle cable
3. Slide the clamps onto the Operator's Manual tube and
install it on top of the lower handle using 2 slotted-head
bolts and 2 locknuts
g194930
8
Use
Install the handle.
Connect the negative battery cable.
5).
Figure 5
4. Slotted-head bolt (2)
5. Cable tie
6. Locknut (2)
(Figure
5).
g195541