Autarco MA-series Installation And Operation Manual

Solar pv module

Advertisement

Quick Links

Installation and Operation Manual
Solar PV Module
© Autarco Group B.V.
IM-S1-EN-18V0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MA-series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Autarco MA-series

  • Page 1 Installation and Operation Manual Solar PV Module © Autarco Group B.V. IM-S1-EN-18V0...
  • Page 2 This manual is an integral part of the unit. Please read the manual carefully before installation, operation or maintenance. Keep this manual for future reference. Product information is subject to change without notice. All trademarks are recognized as the property of their respective owners. © Autarco Group B.V. All rights reserved. Solar PV Module...
  • Page 3: Table Of Contents

    installation and operation manual Contents Table of Introduction ............................4 Read this first .............................. 4 Target Audience ............................4 Product versions covered by this document ....................4 Preparation ............................5 Safety instructions ............................5 Unpacking the modules and storage ......................6 General instructions ...........................
  • Page 4: Introduction

    1. Introduction 1.1 Read this first To reduce the risk of electrical shock, and to ensure the safe installation and operation of the Autarco solar PV modules, the following safety symbols appear throughout this document to indicate dangerous conditions and important safety instructions.
  • Page 5: Preparation

    installation and operation manual 2. Preparation 2.1 Safety instructions Solar modules generate electricity as soon as they are exposed to light. The voltage of a single module is less than 50VDC. When several modules are connected in series, the summed voltage can be dangerously high. When the modules are connected in parallel the currents are summed together.
  • Page 6: Unpacking The Modules And Storage

    WARNING! The following paragraphs are very important. Failure to comply to these instructions can lead to system underperformance and will void the Autarco kWh guarantee. 3.1 Keeping within the maximum permitted load Make sure the support structure adheres to maximum permissible load requirements as prescribed by local ordinances, particularly in regions of high snow accumulations and high wind velocities.
  • Page 7: Fire Safety

    3.7 Shading Even partial shading will cause a yield reduction and can void the Autarco kWh guarantee. A module is “shade free” when the entire surface is shade free from 10:00 to 15:00 local time every day of the year.
  • Page 8: Mounting

    4. Mounting Each module must be securely fastened at a minimum of four (4) points on two (2) opposite sides. The following clamping positions should be adhered to: Clamping positions when clamping on the long sides MA series 220 – 340mm MB-series 220 –...
  • Page 9: Wiring

    Modules should be strung in a way that the resulting voltages and currents do not violate the max. voltage and max. current of the inverter and module which are stated on the product datasheets. When Autarco modules are supplied as part of an integrally designed, complete Autarco solar PV system, the supplied wiring diagram should be followed.

Table of Contents