Download Print this page

PenBarry ZQ80L-GPE Installation Manual

Multi-speed ventilation fan with dimmable light

Advertisement

Quick Links

READ AND SAVE THESE INSTRUCTIONS
Installer: leave this guide with homeowner.
Easy installation in both
new construction and retrofit
TM
Models ZQ80L-GPE n ZQ110L-GPE
Multi-Speed Ventilation
Fan with Dimmable Light
INSTALLATION GUIDE

Table of Contents

2
2
3
7
12
12
12

Advertisement

loading

Summary of Contents for PenBarry ZQ80L-GPE

  • Page 1: Table Of Contents

    Models ZQ80L-GPE n ZQ110L-GPE Multi-Speed Ventilation Fan with Dimmable Light INSTALLATION GUIDE READ AND SAVE THESE INSTRUCTIONS Installer: leave this guide with homeowner. Table of Contents Warnings and Cautions Typical Installation New Construction Installation Easy installation in both Retrofit Installation...
  • Page 2: Warnings And Cautions

    Page 2 WARNING CAUTION TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR . For general ventilating use only. Do not use to exhaust INJURY TO PERSONS, OBSERVE THE FOLLOWING: hazardous or explosive materials and vapors. 1. Use this unit only in the manner intended by the manufacturer. 2.
  • Page 3: New Construction Installation

    Page 3 New Construction Installation Tools needed Materials needed • Power screwdriver with a Phillips bit • 6" round metal ducting recommended for best performance. Use of other ducting is acceptable but may impact performance. • Phillips screwdriver • Roof cap or wall cap (built-in damper recommended) •...
  • Page 4 Page 4 New Construction Installation Snap-in and Secure Housing Position Housing between joists and crimp channel on both sides of Mounting Frame to lock Housing in place. Do not crimp Housing. Screws from Parts Bag Attach Duct Connector and Ducting Top and bottom flanges Screw from go outside Housing...
  • Page 5 Page 5 New Construction Installation Connect Wires and Install Knockout Plate • Run 120VAC electrical wiring to the installation location. • Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag. • Connect wires as shown in wiring diagram. Attach cable clamps to Knockout Plate.
  • Page 6 Page 6 New Construction Installation Insert Mask and Finish Ceiling • Install ceiling material. • Cut out around Housing. Mask protects unit during construction. CAUTION Remove before installing Grille. IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: If the blower was unplugged, power must be disconnected (see page 2, WARNING item 2) before inserting motor plugs into control assembly.
  • Page 7: Retrofit Installation

    Page 7 Retrofit Installation Tools needed Materials needed • Power screwdriver with a Phillips bit • Ruler • Tape to seal duct connections • Phillips screwdriver • Pencil • Existing rigid duct will require the addition of a short length of flexible duct •...
  • Page 8 Page 8 Retrofit Installation Remove Blower Assembly Set aside Blower Assembly Both sides Remove Wiring Panel Set aside Wiring Panel Set aside screw Insert Mounting Frame Remove screws from Mounting Frame Bend up and set aside four tabs...
  • Page 9 Page 9 Retrofit Installation Secure Mounting Frame Screws set aside in Step 7 Snap-in Housing Pull existing wiring into Housing as it is inserted into Mounting Frame Attach Ducting and Duct Connector Screw from Parts Bag Pull existing ductwork into Housing Insert tab into slot inside Housing...
  • Page 10 Page 10 Retrofit Installation Install Knockout Plate, Connect Wires and Reinstall Wiring Panel • Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag. • Connect wires as shown in wiring diagram. Attach cable clamps to Knockout Plate.
  • Page 11 Page 11 Retrofit Installation Reinsert and Secure Blower Assembly CAUTION IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: Power must be disconnected (see page 2, WARNING item 2) before inserting motor plugs into control assembly. Screws from Parts Bag If ceiling repairs are needed, place Mask in Housing after Blower Assembly is secured.
  • Page 12: Operation

    Page 12 Cleaning and Maintenance WARNING Before servicing or cleaning unit, CAUTION switch power off at service panel and lock the service disconnecting means to prevent power from being IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: switched on accidentally. When the service disconnecting DO NOT remove motor plug to stop spinning motor.

This manual is also suitable for:

Zq110l-gpe