Download Print this page
veinview MT6103iP series Installation Instruction

veinview MT6103iP series Installation Instruction

Advertisement

Quick Links

MT6103iP series
Installation and Startup Guide
1
This document covers the installation of MT6103iP Series HMI, for the detailed specifications and operation,
please refer to Brochure and EasyBuilder Pro User Manual.
Install Environment:
NEMA Rating
MT6103iP
Series HMI is NEMA 4 rated (Indoor Only).
MT6103iP
Series has been tested to conform to European CE requirements. This
Electrical
means that the circuitry is designed to resist the effects of electrical noise. This
Environment
does not guarantee noise immunity in severe cases. Proper wire routing and
grounding will insure proper operation.
(1) Make sure that the displays are installed correctly and that the operating
limits are followed. Avoid installing units in environments where severe
mechanical vibration or shocks are present.
(2)
Do not operate the unit in areas subject to explosion hazards due to
Environmental
flammable gases, vapors or dusts.
Considerations
(3) Do not install the unit where acid gas, such as SO2 exists.
(4)
This device should be mounted in the vertical position and for use on the flat
surface enclosure.
(5)
Conform to UL508 (ISBN 0-7629-0404-6) machine safety for use in
Pollution Degree 2 Environment.
2
Unpacking the Unit
Unpack and check the delivery. If damage is found,
notify the supplier.
(1)
(2)
(3)
(5)
(4)
Installation Instruction
NOTE:
Place the operator panel on a stable
surface during installation. Dropping it or
letting it fall may cause damage.
(1) Installation Instruction, 2-sided A4 *1
(2) Human Machine Interface *1
(3) Power Connector *1
(4) Brackets & Screws *1 pack
(5) Fuse 1.25A/250V 5*20mm *1
Installation Instructions
3
Secure the operator panel in position, using all the fastening holes and the provided brackets
and screws. Screw Torque: 2.6 ~ 3.9 lbf.in. (For reaching waterproof effect and preventing the panel from
being deformed.)
(A)
Cutout
(B)
Type
A(mm)
B(mm)
MT6103iP
260
202
Power Connections
4
System Settings
5
When HMI is powered up and displays image,
click the system setting button.
(Default System Password: 111111)
NOTE:
Connect positive DC line to the '+' terminal
1.
and the DC ground to the '-' terminal.
2. Please do not connect HMI with PLC and PC
simultaneously to prevent potential difference
from destroying USB ports of HMI and PC.
Go to the Security tab, the default
password is 111111, click the buttons to
set your own passwords.

Advertisement

loading

Summary of Contents for veinview MT6103iP series

  • Page 1 Screw Torque: 2.6 ~ 3.9 lbf.in. (For reaching waterproof effect and preventing the panel from being deformed.) Installation Instruction Installation and Startup Guide Cutout This document covers the installation of MT6103iP Series HMI, for the detailed specifications and operation, please refer to Brochure and EasyBuilder Pro User Manual. Install Environment: Type A(mm)
  • Page 2: Jumper Settings

    NOTE: Make sure that all local and national electrical standards are met when EasyBuilder Pro Software Settings CAUTION installing the unit. Contact your local authorities to determine which codes apply. Launch EasyBuilder Pro software, select your project file, The unit can be powered by DC power only, voltage range: 24±20% Volts DC, compatible with press F7 shortcut key to open the download dialog box: Power most controller DC systems.