ICS EBS-16 Operation Manual

Industrial power blower

Advertisement

Quick Links

INDUSTRIAL POWER BLOWER
Introduction
INDUSTRIAL CONTRACTORS SUPPLIES is a leading distributor of products and
accessories for environmental management in construction, industry and facility
maintenance applications.
With the invention of the Dust Director
that prevents silica dust from becoming airborne while providing the operator with complete
visibility of the blade and cutting surface, ICS has since established ourselves as a leader and
innovator in the air movement and dust control industry.
This manual is produced solely for the use of purchasers and operators of our Industrial
Power Blowers and Accessories. The intent of this manual is to provide the owner/operator of
our products general and specific information regarding the safe and proper operation and
maintenance of the equipment described within.
Contact
If after careful review, any questions arise concerning any portion of this manual,
contact INDUSTRIAL CONTRACTORS SUPPLIES for assistance at:
INDUSTRIAL CONTRACTORS SUPPLIES, INC.
15061 Route 30, N. Huntingdon, PA 15642
E-MAIL:
info@icscompany.net
Industrial Contractors' Supplies, Inc.
- Dust Control Division -
15061 Route 30, N. Huntingdon, PA 15642
Phone: 412 . 824 . 6933
OPERATIONS MANUAL

About This Manual

Fax: 412 . 824 . 4704
, a dust control guard for handheld angle grinders
®
-1-
www.ICScompany.net
Phone: (412) 824-6933
FAX: (412) 824-4704
WEB SITE:
www.ICScompany.net

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EBS-16 and is the answer not in the manual?

Questions and answers

Summary of Contents for ICS EBS-16

  • Page 1: About This Manual

    ® that prevents silica dust from becoming airborne while providing the operator with complete visibility of the blade and cutting surface, ICS has since established ourselves as a leader and innovator in the air movement and dust control industry. About This Manual This manual is produced solely for the use of purchasers and operators of our Industrial Power Blowers and Accessories.
  • Page 2: Table Of Contents

    Table of Contents SAFETY PAGE Safety Guide ................3 GENERAL INFORMATION Blower Identification .
  • Page 3: Safety Guide

    Safety Guide Safety Guide Failure to follow the operating, maintenance and lubrication requirements set forth in this Operation and Maintenance Manual may result in serious personal injury and/or damage to the equipment. The following WARNING statements indicate potentially hazardous conditions for operators and equipment.
  • Page 4: Power Blower Data

    Steel-Reinforced Rubber. Electric Blowers: All electric motors are single phase, 60 Hz, rigid base, 56 frame with ball and bearings and manual reset overload protection. ELECTRIC ENGINE WIDTH DEPTH HEIGHT UNITS EBS-16 ELECTRIC 1/3 TEFC 3,200 N.A. 1,736 18.75 14.25 19.50...
  • Page 5: Power Blower Electrical Information

    After receiving and unpacking your blower, be sure to carefully inspect it for any damage that might have occurred during shipping. Should you find any PLEASE NOTIFY ICS COMPANY IMMEDIATELY AT: 1-412-824-6933 damage: CAUTION: NEVER MOVE THE BLOWER WHILE IT IS IN OPERATION. SEVERE PERSONAL INJURY IS POSSIBLE AS WELL AS DAMAGE TO THE BLOWER.
  • Page 6: Maintenance Procedures

    Maintenance Procedures Proper maintenance is necessary to ensure that your Industrial Power Blower operates as efficiently and trouble-free as possible. By following the instructions in this section you will be providing the maintenance needed to achieve this goal. BELT ADJUSTMENT The blower drive belt has been adjusted at the factory prior to delivery.
  • Page 7: Blade Removal

    BLADE REMOVAL AND INSTALLATION FOR THE FOLLOWING BLADES BLOWER BLADE CAUTION: THE ENGINE MAY START SIMPLY BY ROTATING THE BLADES. ALWAYS REMOVE THE SPARK PLUG WIRE PRIOR TO WORKING ON THE BLADE SIDE OF THE MOTOR. BLADE REMOVAL PROCEDURES Figure 4.5 1.
  • Page 8: Blade Removal

    BLADE REMOVAL AND INSTALLATION FOR THE FOLLOWING BLADES EB16 blade (260-069) requires a G 5/8 bushing and a 3/16” X 1 3/8” key. BLADE REMOVAL PROCEDURES Remove the eight bolts holding the front gr place and remove the grill (Figure 4.1). Remove the three bolts from blade.
  • Page 9: Maintenance Schedule

    Maintenance Schedule EACH EVERY EVERY EVERY EVERY BLOWER MONTH MONTH MONTH MONTH FIRST 3 OR 10 OR 25 OR 50 OR 100 HOURS HOURS HOURS HOURS HOURS TENSION BELT(S) REPLACE BELT(S) INSPECT BLOWER FOR DAMAGE, FIX IF ANY INSPECT BLOWER FOR LOOSE OR MISSING BOLTS, NUTS, ATTACHMENTS.
  • Page 10: Multiple Blower Placement

    Multiple Blower Placement The use of more than one blower can dramatically increase airflow (volume) and reduce the time necessary to complete a ventilation operation. Figure 5.2 For standard entrance openings (that is, door openings of three feet by six and one-half feet), maximum effectiveness is achieved by placing two blowers "in-line"...
  • Page 11: Exhaust Opening

    Exhaust Opening Positive pressure ventilation is most effective when the exhaust opening (window, door, etc.) is between three-fourths to twice the size of the entrance opening (Figure 5.4). This variance is due to the number and CFM’S of the blower(s) utilized and can be summarized as follows: Figure 5.4 A single blower powered by 1/3 HP to 4 HP electric motor is most effective when utilized with exhaust openings that are three-fourths or slightly less than the size of the entrance opening.

This manual is also suitable for:

Eb-16-vsg

Table of Contents