Download Print this page

Farmhouse FH2012 Manual page 3

20 ft x 12 ft

Advertisement

BEARING POINTS FOR
FH2O1.2
AND BUILDING THE
FLOOR
IOIST
BOXES
RIGHT WRAP AROUND
JOIST
BOX
CONFIGURATION r'l
46%"
[118L]
[1181]
[603 3]
RIDGE PORCH SIDE
Each
bearing
point represents
a
spot where the
joist
boxes
intersect
each other.
Using a cement
block at
each of these
points, level the joist structure
once the
joist
boxes have been affixed
together.
Use
the diagram
above
to plot the bearing points
on
your building site.
Please note
that these
are
the minimum number of bearing
points
and
you
may
wish to
use
additional cement blocks
as
need
would justify.
G
A
B
L
E
P
o
R
c
H
S
I
D
E
rl1
|
48"
l-.ro" --1"-,*'
-J:
46%"
-l
I
l1.z'rsl [610] [660]
[1181]
t.:
237
1/2,,
-l- ,
46%"

Advertisement

loading