Installation Instructions - Eneo NE-112 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Power Supply Unit NE-112, NE-112/2,
NE-112/AC24V
I. Technical data
EDP No.
Input voltage
Output voltage
Max. load current
Max. ripple voltage
Frequency
Insulation strength
Constructed to:
Primary fuse
Heating connection
Dimensions
(H x W x D) in mm
Weight
For housing type
Accessories
NE-112
79364
12VDC,
stabilized
600mA
< 10mV eff. at max. load current
230VAC / 100mA max.
72 x 96 x 41
0.5kg
Cable adapter for connection for the distribution board
NE-112/2
79423
230VAC ± 10%
12VDC stabilized
/ 24VAC
600mA / 1.0A
50Hz
> 4KV
DIN VDE 0805
T1.25A
97.5 x 96 x 49
1.2kg
VHM
NE-112/AC24V
79491
24VAC
500mA
72 x 96 x 41
0.5kg

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne-112/ac24vNe-112/2

Table of Contents