„GenAu“ tool is available for download at www.SMA.de. If you have any further questions please do not hesitate to call the Sunny Boy hotline on the following number: +49 561 9522-499 All trademarks mentioned in this Installation Guide are accepted. SB2800i-11:SE0504 SMA Regelsysteme GmbH...
Page 6
Introduction Installation Guide SMA Regelsysteme GmbH SB2800i-11:SE0504...
The Sunny Boy 2800i is equipped with the anti-islanding unit „SMA grid guard“. The Sunny Boy 2800i therefore complies with the VDEW guidelines for grid interactive inverters and the DIN VDE 0126 (4.99) specified in this regulation.
Page 8
Safety Instructions Installation Guide SMA Regelsysteme GmbH SB2800i-11:SE0504...
Installation Guide Overview Overview 3.1 Device Description The following figure shows the different components and connection areas of an open Sunny Boy 2800i inverter. Communication socket Varistors, (RS232, RS485, PLC), page 31 page 25 Socket for display unit (Sunny Display)
Please make sure to fulfill all conditions below before installing and commissioning the Sunny Boy. 4.1 Requirements: Mounting Place The Sunny Boy 2800i has a relatively high weight of 31 kg. Please keep this in mind when selecting the place where and how to mount the Sunny Boy.
Page 12
5 cm Table 4.1: Minimum clearance If you want to install several Sunny Boy 2800i side by side on the same level, pay attention to the minimum distance between them. If there is not enough space between the devices, the left Sunny Boy will reduce the yield of the PV plant because of the incomming air temperature.
We recommend to install the inverter on a firm and sturdy surface. Mounting the Sunny Boy on a thin sur- face may emit a slight noise! SB2800i-11:SE0504 SMA Regelsysteme GmbH...
Page 14
Requirements for the Installation Installation Guide 4.2 Requirements: PV-Modules The Sunny Boy 2800i is designed for the connection of up to three strings (PV modules connected in series). The „ GenAu“ tool will help to dimension and check the size of your strings with respect to the Sunny Boy you intend to use.
The relevant technical regulations as well as specific requirements defined by the local public utility have to be complied with. The terminals of the Sunny Boy 2800i are suitable for cables with The Sunny Boy has to be connected a cross-section of up to 2.5 mm². The Sunny Boy is connected with to grid with three wires! three wires (L, N, PE).
Page 16
Fig. 4.1: Losses in AC cable The Sunny Boy 2800i is designed for 230 V grids. The voltage should be within 198 V and 260 V and the frequency should be within 49.8 Hz and 50.2 Hz.
8 mm x 50 mm hexagon screws according to DIN 571 and with dowels type SX8. Keep the weight of the Sunny Boy 2800i (31 kg) in mind. 1. Mount the bracket. To mark the positions for drill holes you can also use the bracket as a drilling template.
Thus, the module has three plus poles and three minus poles. These poles are simply connected in parallel within the inverter. In case only one String terminal is used, please cover the four plug-in contacts not used with the seals enclosed. SMA Regelsysteme GmbH SB2800i-11:SE0504...
Page 19
• Phase L to the terminal marked with „ 2“ • The terminal marked with „ 3“ is not used. 7. Make sure that all wires are firmly connected. 8. Push the socket tube firmly onto the socket. SB2800i-11:SE0504 SMA Regelsysteme GmbH...
Page 20
Boy, insert the AC connector plug and tighten the seal. Do not switch on the circuit breaker yet! The Sunny Boy 2800i may only be connected to the AC grid when the PV strings have been connected and the device is tightly closed.
Page 21
When you have found a ground fault in a string, only connect it to the Sunny Boy 2800i after you have removed the cause for the ground fault in the PV generator.
Page 22
If the lower yellow LED repeatedly blinks once a second for four times, immediately disconnect the grid voltage and the PV generator from the Sunny Boy 2800i. The input voltage is too high. The inverter might be damaged! Check whether string voltages comply with limiting values stated in chapter 4.2 "Requirements: PV-Modules"...
Proceedings for activation 1. Switch the circuit breaker on. 2. Check whether the LEDs indicate trouble-free operation of the Sunny Boy 2800i based on the following table. If this is the case commissioning has been successfully completed. SB2800i-11:SE0504 SMA Regelsysteme GmbH...
Page 24
(approx. 1 x per permanently on failure second) OK (stand-by) on/blinking failure failure permanently on on/blinking failure Table 5.1: LED blinking codes You will find a detailed description of failure messages and their causes in the „ Operating Instructions“. SMA Regelsysteme GmbH SB2800i-11:SE0504...
3. Wait 5 minutes! (This is necessary to let the internal capaci- tors discharge.) 4. Unscrew the lid from the enclosure of the Sunny Boy 2800i. The screws are on the underside of the Sunny Boy. 5. Pull down the lid carefully (approx. 4 cm) 6.
Page 26
2. Connect the PV generator. Make sure to connect each plug to the correct terminal. 3. Switch on the circuit breaker. This activates the Sunny Boy 2800i. 4. Check whether the LEDs of the Sunny Boy 2800i indicate trouble-free operation. SMA Regelsysteme GmbH SB2800i-11:SE0504...
The following conditions must be fulfilled for Powerline Communication: • The Sunny Boy 2800i has to be equipped with the „ PLC signal unit“ (see chapter 3.1 "Device Description" (p. 7)). The Sunny Boy 2800i can be upgraded for powerline communication.
15 m to one single Sunny Boy 2800i. The following conditions must be fulfilled for RS232 communication. • The Sunny Boy 2800i has to be equipped with a second cable gland (included in delivery) between the PV input plugs and the cable opening for AC output on its underside.
Page 29
Installation Guide Communication Abb. 7.1: Sunny Boy connected to a PC via RS232 SB2800i-11:SE0504 SMA Regelsysteme GmbH...
5 different Sunny Boy types and all in all 20 Sunny Boy inverters in total. To provide for an RS485 interface the Sunny Boy 2800i has to be equipped with the second cable gland included in delivery. The delivery includes two different gland fittings (a fitting with one hole for one cable and a fitting with two holes for two cables).
Page 31
Enclosure Enclosure Shielding Data + Data - The connection of one or several Sunny Boy inverters to a Sunny Boy Control is described in detail in the manual of the Sunny Boy Control. SB2800i-11:SE0504 SMA Regelsysteme GmbH...
Page 32
One or several Sunny Boys connected with an RS485 cable to a PC with interface converter. SMA reccomends the usage of a I-7520 interface converter for the connection of an RS485 bus to a PC. SMA does not support any other types. SMA Regelsysteme GmbH SB2800i-11:SE0504...
Installation Guide Exchanging varistors Exchanging varistors The Sunny Boy 2800i is a very complex technical device. Therefore there are only a few possibilities to repair failures on site. Please do not try to make repairs other than described in this document.
Page 34
You can now check the varistors as described below while following the safety instructions given in chapter 2 "Safety Instructions" (p. 5). 6. Unscrew the lid of the Sunny Boy 2800i and remove it. Dis- connect the PE plug inside the lid. Test safe isolation from supply.
Page 35
Installation Guide Exchanging varistors 11. Switch on the circuit breaker. 12. Check whether the LEDs of the Sunny Boy 2800i show trouble-free operation. If you have found neither a ground fault nor a defective varistor there probably is a fault in the inverter. Please contact the SMA hotline in this case to discuss further proceedings.
Page 36
Exchanging varistors Installation Guide SMA Regelsysteme GmbH SB2800i-11:SE0504...
SMA: • Type of inverter used • Connected modules • Communication • Serial number of device Address: SMA Regelsysteme GmbH Hannoversche Straße 1 - 5 34266 Niestetal Germany Tel.:+49 (561) 95 22 - 499 Fax:+49 (561) 95 22 - 4699 hotline@SMA.de...