ELEMENTS OUTDOOR LIVING ™ BORDEAUX GRILL ISLAND INSTALLATION MANUAL BELGARD.COM...
Page 2
OVERVIEW The Bordeaux Grill Island from the Belgard Elements Collection consists of three pieces. The ™ units are shipped on two pallets. One pallet will have the island and the other pallet will have the stainless grill head and door set. Also included are the “plugs” for all fork slots. There are a total of four plugs, which are found inside the base unit.
WHAT’S INCLUDED The major components for the grill island are shown in Figures 1 and 2. Figure 1 shows the grill head and doors of the grill island. Figure 2 shows the base unit of the grill island. Figure 2 also shows the filler blocks or “plugs”...
Page 4
™ assembly. 1. DO read and follow the Bordeaux Grill Island Installation Manual. 2. DO NOT climb on top of the base or top unit of the grill island. 3. DO NOT move the base or top of grill island without the proper lifting equipment.
Page 5
GRAVEL BASE A properly constructed graded aggregate base is a minimum requirement for placement of your unit. The sketches below show the minimum excavation area for different unit assemblies in a stand- alone configuration; note that the excavation area extends one foot beyond the actual footprint of the unit assembly on all sides.
Page 6
INSTALLING THE GRILL ISLAND The first step after a gravel base has been established is to place the base unit. ISLAND BASE UNIT After the island base unit has been placed you can now place the grill head and doors. GRILL HEAD UNIT NOTE: Please refer to stainless install manuals...
Page 7
INSTALLING “PLUGS” With every Belgard Elements Grill Island base you will find a set of “plugs” that are used to fill the ™ fork slots on the units. Push the plugs in slowly until they are flush with the blocks next to them. It is not necessary to glue them in place.
Page 8
CONCRETE PAD INSTALL FIGURE A - Before installing grill island, please review local building code requirements in your area. It may also necessary to construct a concrete pad to set the unit on. Before construction of the concrete pad it is necessary to establish Finish Grade height first to ensure the first course of the unit is buried 4”.