Battery Backup Power BBP-AR-1500-PSW-ONL-EBP User Manual

Battery Backup Power BBP-AR-1500-PSW-ONL-EBP User Manual

Tower external battery pack. tower external battery pack

Advertisement

Battery Pack Installation
User's MANUAL
0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BBP-AR-1500-PSW-ONL-EBP and is the answer not in the manual?

Questions and answers

Summary of Contents for Battery Backup Power BBP-AR-1500-PSW-ONL-EBP

  • Page 1 Battery Pack Installation User's MANUAL...
  • Page 2: Table Of Contents

    Table of Contents Chapter 1. IMPORTANT SAFETY INSTRUCTIONS ........... 2 Chapter 2. Introduction to the Front and Rear Panel ........... 4 2.1. Front and Rear Panel Descriptions ............ 4 Chapter 3. Installation and Operation ..............5 3.1. Unpacking ..................5 3.2.
  • Page 3: Chapter 1. Important Safety Instructions

    Chapter 1. IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during installation and maintenance of the battery bank and batteries. Important Notice • This battery bank is connected to an UPS. There will be voltage at the output terminals if the UPS is turned on even if the input AC Mains is not available.
  • Page 4 • CAUTION – Do Not Dispose of Battery(ies) in open fire or high temperature environment. The Battery May Explode. • CAUTION – Do not open or mutilate the batteries. The electrolyte of the batteries is toxic and harmful to the skin and eyes. •...
  • Page 5: Introduction To The Front And Rear Panel

    Chapter 2. Introduction to the Front and Rear Panel 2.1. Front and Rear Panel Descriptions 1. Battery Over-current Protection. 1. DC Breaker (Standard) 2. Easily remove battery bank from system. 2. Battery Connector Battery bank extending connector. 3. DC Power Cord To link with UPS and battery banks.
  • Page 6: Chapter 3. Installation And Operation

    Chapter 3. Installation and Operation Note: The packing condition and the external outlook of the unit should be inspected carefully before installation. Retain the packing material for future use. 3.1. Unpacking 1. Remove the packing foams and take the battery bank out of the box. Warning: The unit could be quite heavy.
  • Page 7: Selecting Installation Position

    3.2. Selecting Installation Position It is necessary to select a proper environment to install the unit, in order to minimize the possibility of failure to the battery bank and extend the life of the batteries. Please follow the instructions below: 1.
  • Page 8: Connect Dc Cable

    3.2.1. Connect DC Cable Second Battery Bank First Battery Bank Second Battery Bank First Battery Bank...
  • Page 9: Storage Instruction

    3.3. Storage Instructions For extended storage through moderate climates (-15 to +30°C / +5 to +86°F), the batteries should be charged for 12 hours every 6 months by plugging the UPS power cord into the wall receptacle or by an external charger. Repeat this every 3 months under high temperature (+30 to +45 °C / +86 to +113 °F) environments.
  • Page 10: Specification

    3.4. Specification 120V 1KVA 120V 1.5KVA 120V 1KVA 120V 2KVA (24V) (36V) (24V) (48V) 230V 1KVA 230V 1KVA 230V 1KVA 230V 2KVA (24V) (36V) (24V) (48V) BBP-AR-1000- BBP-AR-1000- BBP-AR-1500- BBP-AR-2000- Model code PSW-ONL-EBP- PSW-ONL-EBP- PSW-ONL-EBP PSW-ONL-EBP Voltage Rating 24VDC 36VDC 24VDC 48VDC Capacity x Strings...
  • Page 11 120V 3KVA 120V 3KVA (72V) (72V) 230V 3KVA 230V 3KVA 230V 2/3KVA 230V 2/3KVA (96V) (96V) (72V) (72V) BBP-AR-3000- BBP-AR-3000- BBP-AR-3000- BBP-AR-3000- Model code PSW-ONL-EBP- PSW-ONL-EBP- PSW-ONL-EBP- PSW-ONL-EBP- Voltage Rating 96VDC 96VDC 72VDC 72VDC Capacity x Strings 7/9Ah x 8 7/9Ah x 16 7/9Ah x 18 7/9Ah x 12...
  • Page 12: Recycling The Used Battery

    3.5. Recycling the Used battery Contact your local recycling or hazardous waste center for information on proper disposal of the used battery.

Table of Contents