Download Print this page

Advertisement

Quick Links

Tel: 717-768-0804
176 S. New Holland Road
Fax: 717-768-8569
Gordonville, PA 17529
A S S E M B LY M A N U A L
Treehouse Loft

Advertisement

loading
Need help?

Need help?

Do you have a question about the Treehouse Loft and is the answer not in the manual?

Questions and answers

Summary of Contents for Pinnacle Treehouse Loft

  • Page 1 Tel: 717-768-0804 176 S. New Holland Road Fax: 717-768-8569 Gordonville, PA 17529 A S S E M B LY M A N U A L Treehouse Loft...
  • Page 2: Tools Needed

    Take a deep breath and get at it, the satisfaction and enjoyment of playing in this unit is only a few hours away. Have Fun!!!!! Remember, it is very important that you have a level site for your Treehouse Loft, and that the floor is level prior to setting the walls.
  • Page 3 86-1/4” pieces with no holes will make up the sides of the base. The 5/8” holes in the mid- section of the front piece must be left of center, to line up with © Pinnacle Play Systems page 3 the holes in the floor.
  • Page 4 2 x 6s in the floor and base bolts. into the posts. The bottom holes in the posts will line up with the holes in the 2x6s of © Pinnacle Play Systems page 4 the base.
  • Page 5 2x6 joists of the loft floor. Keep the 2x3s that are cut short towards the back. © Pinnacle Play Systems page 5...
  • Page 6 4x4 posts. (make sure that the top rung is less than 3-1/2" away from floor to page 6 © Pinnacle Play Systems leave no room for entrapment).
  • Page 7 3" deck screws. The left side- make sure corners fit screws through 2x3 into wall will also have a 3" x 5-1/2" tightly. 2 x 6 joist. opening at the top back corner for the swing arm. © Pinnacle Play Systems page 7...
  • Page 8 3" deck screw with rafters on gable each outside rafter end walls and down through 2 x 6 of side- into gable rafters. walls up into bottom of tight against top of side- rafters. walls. © Pinnacle Play Systems page 8...
  • Page 9 Start at flush with bottom cor- fit trim keeping corners the peaks and keep the top ners of the peak trim. flush. of the trim flush with the top page 9 © Pinnacle Play Systems of the plywood roof panels.
  • Page 10 Install 1/2" lock washer and nut on to threads of 6 1/2" carriage bolts and tighten with 3/4" socket wrench. Step 52: Slide one section of swing arm through 3" x 5- 1/2" holes in each side wall. © Pinnacle Play Systems page 10...
  • Page 11 It will be necessary to check for splinters and screws that protrude through surfaces during and after the entire assembly process. Be sure to remove sharp objects and check play set periodically for loose hardware. © Pinnacle Play Systems page 11...
  • Page 12 © Pinnacle Play Systems I n s t r u c t i o n s f o r p a i n t t o u c h u p o n a P i n n a c l e P l a y s e t A major benefit of purchasing a painted playset is that damage to the set via a pocket knife, etc.
  • Page 13 Apply a second coat of paint after the first coat has dried. The second coat of paint is essential to provide long lasting protection and restore the repaired area to the same luster as the original paint. © Pinnacle Play Systems...