Vertiv Liebert PPC User Manual
Vertiv Liebert PPC User Manual

Vertiv Liebert PPC User Manual

Second generation power conditioning and distribution cabinet three-phase, 15 - 225kva, 50 & 60hz
Table of Contents

Advertisement

Quick Links

Liebert
PPC
®
Second Generation Power Conditioning and Distribution Cabinet
User Manual—Three-Phase, 15 - 225kVA, 50 & 60Hz

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Liebert PPC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Vertiv Liebert PPC

  • Page 1 Liebert ® ™ Second Generation Power Conditioning and Distribution Cabinet User Manual—Three-Phase, 15 - 225kVA, 50 & 60Hz...
  • Page 3: Table Of Contents

    Preventive Maintenance (Inspection and Cleaning)..........45 Vertiv ®...
  • Page 4 Figure 15 Typical Liebert PPC equipment arrangement........
  • Page 5: Important Safety Instructions

    Risk of improper handling. Can cause equipment damage, injury or death. The Liebert PPC is heavy; its weight ranges from 400lb. (182kg) to 2450lb. (1111kg) The unit should not be loosened from the shipping pallet until after all handling by forklift or pallet jack is completed ELECTROMAGNETIC COMPATIBILITY—The Liebert PPC complies with the limits for a Class A digital device,...
  • Page 6: Installation Instructions

    Inspect for damage or signs of mishandling before unpacking the unit(s). Check the Shock-Watch indicator. If the Liebert PPC was shipped in an export crate, open the shipping crate carefully. (Use care to avoid puncturing the container with sharp objects that would damage the contents.) Remove the packing and vapor barrier and inspect the equipment for any obvious shipping damages.
  • Page 7: Figure 1 Typical Cabinet And Floor Planning Dimensions, Sidecar

    Floor Pedestals 6" Available from 6"-19" (152mm) 6" (152mm) Pedestal (152mm to 483mm) Footprint 2-1/4" (57mm) Optional Floor 2-1/4" Pedestals (57mm) 3/4" (19mm) 3/4" 2-1/4" (19mm) (57mm) Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 8: Figure 2 Typical Cabinet And Floor Planning Dimension Data

    32 (813) 30 (762) 18 (457) 15 (381) 17 (432) 29 (737) 150 to 225 44 (1118) 42 (1067) 30 (762) 27 (686) 29 (737) 41 (1041) Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 9: Figure 3 Typical Cabinet And Floor Planning Dimension Data, Top Exit Unit

    1500 (680) 1789 (813) 2110 (959) 2353 (1070) Footprint Dimensions Dimensions, in. (mm) No. of Unit kVA Panelboards 15-125 32 (813) 30 (762) 150-225 44 (1118) 42 (1067) Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 10: Unit Preparation

    1.1.4 Location Considerations The Liebert PPC should be located within the computer room, and/or close to the load(s) which it is supplying. Equipment Location—Should employ the shortest output distribution cable runs consistent with logical equipment arrangement and allowances for future additions.
  • Page 11: Figure 4 Recommended Minimum Service And Ventilation Clearances

    Heat output Full Load Heat Output, BTU/hr (kW) BTU/hr (kW) 1915 (0.56) 3995 (0.88) 4360 (1.28) 6140 (1.80) 7680 (2.25) 9460 (2.77) 10,660 (3.13) 13,930 (4.08) 15,350 (4.45) Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 12: Floor Pedestal Installation

    Threaded 3" Shaft (76mm) Washer Welded Nut Jam Nut Pedestal Base 9/16" (14mm) diameter mounting holes 2-1/4" (57mm) 6" (152mm) square 2-1/4" (57mm) 2-1/4" 2-1/4" (57mm) (57mm) Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 13: Distribution Sidecar Mounting And Wiring

    • Phase C (wire 432) to X3 The sidecar neutral (Wire 442) and ground (Wire 452) conductors are connected to the Liebert PPC main ground busbar (see unit wiring diagram). For Liebert PPC’s without transformers, the sidecar phase and neutral conductors are connected to the corresponding output power distribution terminal blocks inside the main unit.
  • Page 14: Input Power Connections

    For units with a transformer, the main input feeder should consist of 3-phase conductors and one (safety) ground conductor (3W + G). For units without a transformer, the main input feeder must consist of 3-phase conductors, one neutral and one (safety) ground conductor (4W + G). Vertiv | Liebert ® ™...
  • Page 15: Figure 6 Electrical Connection Locations, Sidecar Unit

    Distribution Panelboard 1. The unit bolts to the main Liebert Precision Power Center. See installation manual for instructions. 2. Site panel is taken from the Liebert PPC Ground Connections and installed to either the left or right side Distribution Cable Ground(s) of the unit.
  • Page 16: Figure 7 Electrical Connection Location For 72-Pole Square D Or 54-Pole Ge Panelboards, 32" Cabinet

    Figure 7 Electrical connection location for 72-pole Square D or 54-pole GE panelboards, 32" cabinet, bottom entry/exit PPC15100 Rev. 0 Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 17: Figure 8 Electrical Connection Locations, For 54-Pole Square D Or 42-Pole Ge Panelboard, 32" Cabinet

    (1-3/4" spacing) with ø0.563 Detail D hole. Connect ground and Subfeed Circuit Breaker neutral wires to main ground and neutral busbars PPC15101 Rear View Rev. 0 Without Doors Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 18: Figure 9 Electrical Connection Location For 72-Pole Square D Or 54-Pole Ge Panelboard, 44" Cabinet

    Figure 9 Electrical connection location for 72-pole Square D or 54-pole GE panelboard, 44" cabinet, bottom entry/exit PPC15102 Rev. 0 Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 19: Figure 10 Electrical Connection Locations, 54-Pole Square D Or 42-Pole Ge Panelboard, 44" Cabinet

    PPC15103 conductor. Not needed on REAR VIEW Without Doors and Access Panels systems without transformer. Rev. 0 Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 20: Figure 11 Electrical Connection Location For 54-Pole Square D Or 42-Pole Ge Panelboard, 32" Cabinet

    ø0.563" (14mm) conductor. Not needed on Detail C (6 places) systems without transformer. Ground Busbar PPC15121 Rev. 0 Rear View Without Doors and Access Panels Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 21: Figure 12 Electrical Connection Location For 72-Pole Square D Or 54-Pole Ge Panelboard, 44" Cabinet

    Figure 12 Electrical connection location for 72-pole Square D or 54-pole GE panelboard, 44" cabinet, top entry/exit PPC15122 Rev. 0 Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 22: Table 2 Suggested Minimum Input Wire Size Data

    350 kcmil 350 kcmil (2) 000* (2) 000* (2) 0000* (2) 0000* 415V 0000 0000 350 kcmil 350 kcmil (2) 000* (2) 00* (2) 0000* (2) 000* Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 23: Table 3 Main Input Circuit Breaker Interrupting Rating

    250 kcmil 350 kcmil * Parallel feeders per NEC 300-20 and 310-4. FLA = Full Load Amps of Liebert PPC OPD = Overcurrent Protection Device inside Liebert PPC Wire Sizes based on NEC Table 310-16, using 75°C copper conductor. NOTES: Main input power feeder should be a dedicated feeder direct from service entrance or other power source, if possible.
  • Page 24: Junction Box Installation (If Used)

    1.3.2 Junction Box Installation (If Used) Main input (power) and low-voltage (control) junction boxes are available for the Liebert PPC to simplify customer connections. Shipping Arrangements—The junction boxes, if used, can either be shipped with the system or can be advance-shipped for installation during the roughing-in stage of new construction.
  • Page 25: Figure 13 Typical Junction Box Connections

    LOW-VOLTAGE CONTROL JUNCTION BOX Customer input power connection 3 Phase 3W+G for units with transformer 3 Phase 4W+G for units without transformer Factory-supplied input cable assembly MAIN INPUT JUNCTION BOX Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 26: System Grounding

    1.3.4 Grounding Electrode Conductor (Units With Transformer) Required by code—The Liebert PPC with transformer must be grounded according to the safety practices of NEC 250-26. A local grounding electrode conductor is recommended in addition to the equipment safety ground, which is normally run with the input power conductors.
  • Page 27: Figure 14 Typical Grounding Arrangements

    (if used) Service entrance Signal reference grid grounding electrode Local grounding (if used) system electrode conductor per NEC 250-26 TYPICAL LIEBERT PPC WITH TRANSFORMER GROUNDING ARRANGEMENT Service Input Liebert PPC Entrance J-Box (without transformer) (if used) Service entrance Signal reference grid...
  • Page 28: Output Power Connections

    Air circulation—Prevent restriction of airflow under the raised floor by running the flexible conduits flat on the sub-floor, in parallel paths. For best performance, the Liebert PPC should be located as close to the load as practical. Initial system output loading should be between 50% and 75% of rated capacity. This allows the addition of future loads without immediately investing in another power conditioner.
  • Page 29: Figure 15 Typical Liebert Ppc Equipment Arrangement

    Figure 15 Typical Liebert PPC equipment arrangement * REPO Switch Liebert PPC Ground electrode conductor (not by Vertiv) required per NEC for units with transformer Main input power to unit (not by Vertiv) 3-phase, 3-wire plus ground for units with transformer...
  • Page 30: Control Wiring Connections

    The shunt-trip solenoid opens the Main Input Breaker, which de-energizes the Liebert PPC. Multiple-unit shutdown—When more than one Liebert PPC is installed by the user, a typical requirement is that actuation of a single device (REPO, for example) must shut down all Liebert PPC’s. The low-voltage control circuits of all standard Liebert PPC systems are designed to meet this requirement.
  • Page 31: Figure 17 Typical Control Wiring For Units Without Monitoring

    REPO lamps. Maximum 24VDC supply available is 1 Amp total. Both N.O. and N.C. REPO switches are powered from the same supply. All auxiliary control devices and cabling to be field-supplied except as noted. Overtemperature alarm contacts change state when unit overtemperature is sensed. Vertiv | Liebert ® ™...
  • Page 32: Figure 18 Typical Control Wiring For Units With Power Monitoring

    Customer Alarms 1 through 4 are Normally Open (indicates alarm on contact closure). Customer Alarm 5 is Normally Closed (indicates alarm on contact opening). For Liebert SiteScan connection, use #22AWG shielded cable; maximum distance 1000 ft. (300m). Vertiv | Liebert ®...
  • Page 33: Figure 19 Control Wiring For Units Without Low-Voltage Control Box

    Customer Alarms 1 through 4 are Normally Open (indicates alarm on contact closure). Customer Alarm 5 is Normally Closed (indicates alarm on contact opening). For Liebert SiteScan connection, use #22AWG shielded cable; maximum distance 1000ft (300m). Vertiv | Liebert ®...
  • Page 34: Adapter Board

    1.3.7 Adapter Board The Adapter Board (AB) provides customer interface to the Liebert PPC monitoring systems for units without Low-Voltage Junction Box. Connections are made to terminal strip TB1 for Remote Emergency Power Off (REPO) switches, summary alarm contacts and customer alarms (Liebert Power Monitor Panel with Velocity Protocol [VPMP];...
  • Page 35: Equipment Inspection And Startup

    Services. In the USA, call 800-543-2378. Warranty effectivity—A copy of the appropriate checklist (furnished with the equipment) must be completed, signed, dated, and returned to Vertiv. Warranty coverage of the equipment is not effective unless the checklist is received by the factory.
  • Page 36: Table 8 Panelboard Main Circuit Breaker Torque Specifications

    Breaker Size lb-in Up to 30A 40 to 100A Table 11 Terminal block compression lug torque specifications Torque AWG Wire Size or Range lb-in #14 - #10 Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 37: Inspection And Startup Checklist

    ___ 11. Check that the intake and exhaust air screens are clean and free of obstructions. ___ 12. Replace side panels, leaving access to circuit breakers for the following startup procedure. NOTE Reconnect the panel ground wires before replacing the side panels. Vertiv | Liebert ® ™...
  • Page 38: Startup

    Volts, phase B to neutral = ______________________ Volts, phase C to neutral = ______________________ If output voltage is incorrect, check for wiring errors, incorrect input voltage, or improper transformer tap. Contact Vertiv Services at 800-543-2378 in the USA or the local factory representative for assistance.
  • Page 39: Monitoring System Check-Out

    NOTE The Liebert PPC transformer has input voltage taps for each input phase. The taps are arranged in 2-1/2% or 5% intervals ranging from -10% to nominal to +5%. This permits the transformer to provide the proper output voltage for a range of input voltages. Should it be necessary, the tap arrangement may be changed to match the input voltage: •...
  • Page 40: Equipment Connection Check-Out (For Units With Distribution Cables)

    Liebert Corporation 1050 Dearborn Drive P.O. Box 29186 Columbus, Ohio 43229 USA NOTE Warranty is not in effect unless Inspection and Startup form is received by the factory. Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 41: Operating Instructions

    The load equipment can be turned Off at each piece of load equipment or at the Liebert PPC’s output distribution (circuit breaker) panels located behind the unit’s front door. Turn Off all unit output breakers, then turn Off the unit’s main input circuit breaker.
  • Page 42: Basic Monitor Panel

    392°F (200°C). After the alarm condition is corrected, the alarm will automatically reset. See Figure 17 for remote summary alarm and Remote Emergency Power Off switch connections. Figure 20 Liebert PPC controls and indicators Emergency Power Off (EPO) Push Button Power Indicator...
  • Page 43: Power Monitor Panel

    Output Current Crest Factor (Peak/RMS) for all three phases • Percent Load • Output Current Harmonic K-Factor for all three phases • Date • Output Neutral Current • Time Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 44 IS-IPBMS Card provides Modbus IP output. An RJ-45 connector is supplied for customer connection. • IS-UNITY-DP Card provides HTTP/HTTPS, Vertiv Protocol, e-mail, SMS, SNMP v1/v2c/v3, BACnet IP/MSTP and Modbus TCP/RTU output using a serial RS-485 two-wire connection. Up to three cards can be plugged into the Liebert IntelliSlot ports provided with the VPMP system.
  • Page 45: Liebert Current Plus Monitoring (If Supplied)

    Power Factor • Voltage Total Harmonic Distortion (THD) • Current Total Harmonic Distortion (THD) • Crest Factor Circuit identification and status of each breaker may be displayed. Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 46 IS-IPBMS Card provides Modbus IP output. An RJ-45 connector is supplied for customer connection. • IS-UNITY-DP card provides HTTP/HTTPS, Vertiv Protocol, e-mail, SMS, SNMP v1/v2c/v3, BACnet IP/MSTP and Modbus TCP/RTU output using a serial RS-485 two-wire connection Up to three Liebert IntelliSlot cards may be installed in the Liebert CPM system.
  • Page 47: Liebert Distribution Monitoring (If Supplied)

    • Voltage—Line-to-Neutral • Neutral Current • Ground Current • • Power Factor • Voltage Total Harmonic Distortion (THD) • Current Total Harmonic Distortion (THD) • Crest Factor Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 48 • IS-IPBMS Card provides Modbus IP output. An RJ-45 connector is supplied for customer connection. • IS-UNITY-DP Card provides HTTP/HTTPS, Vertiv Protocol, e-mail, SMS, SNMP v1/v2c/v3, BACnet IP/MSTP and Modbus TCP/RTU output using a serial RS-485 two-wire connection ™ Up to three cards can be plugged into the Liebert IntelliSlot ports provided with the Liebert LDMF system.
  • Page 49: Maintenance

    MAINTENANCE Corrective Maintenance Even the most reliable equipment may fail. Vertiv Services is at your service to assure fast repair of your unit and minimum down-time of your installation. WARNING Risk of electric shock. Can cause injury or death. Hazardous voltages are present within the Liebert PPC. Only properly trained and qualified service personnel should perform maintenance on the Liebert PPC system.
  • Page 50 NOTES Vertiv | Liebert ® ™ User Manual | Rev. 6 | 03/18 |...
  • Page 51 TECHNICAL SUPPORT / SERVICE Web Site www.vertivco.com Monitoring liebert.monitoring@vertivco.com 800-222-5877 Outside North America: +00800 1155 4499 Three-Phase UPS & Power Systems 800-543-2378 Outside North America: 614-841-6598 LOCATIONS United States 1050 Dearborn Drive P.O. Box 29186 Columbus, OH 43229 Europe Via Leonardo Da Vinci 8 Zona Industriale Tognana 35028 Piove Di Sacco (PD) Italy +39 049 9719 111...
  • Page 52 © 2016 Vertiv Co. All rights reserved. Vertiv and the Vertiv logo are trademarks or registered trademarks of Vertiv Co. All other names and logos referred to are trade names, trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness herein, Vertiv Co. assumes no responsibility, and disclaims all liability, for damages resulting from use of this information or for any errors or omissions. Specifications are subject to change without notice.

Table of Contents