Content 1 Document Content ...............1 1.1 Function ...................1 1.2 Target group: Authorised personnel .........1 1.3 Symbols and abbreviations used ..........1 1.4 Proper use ................2 1.5 General notes on safety ............2 1.6 Warning of misuse ..............2 1.7 Disclaimer .................2 2 Product Description ..............3 2.1 Type code .................3 2.2 Terms and conditions and use ..........3 2.3 Technical data ................3...
1 | Document Content 1.4 Proper Use The products described here have been developed in order to ensure 1.1 Function functions as part of an overall system. It is the responsibility of the in- staller to ensure the correct overall functioning. This operating instructions manual provides necessary information on It may be used only in accordance with the following versions or for installation, commissioning, safe operation, disassembly and disposal.
2 | Product Description Figure 2.3 2.1 Type code Current / Time This operating instructions manual is valid for the following types: M 13 85 Guard-/ lock plate for tube frame* M 13 86 Guard-/ lock plate for wood* M 13 25 Lock plate / mounting box for tube frame* M 13 26 Lock plate / mounting box for wood*...
3 | Assembly Flügel Rahmen M 13 85 Leaf Frame 3.1 General notes on assembly Due to the plurality of profiles and fittings available on the market, no general information for mounting can be given since these systems differ in several dimensions. Please check the place of installation and the space available in the rabbet and profile area before the beginning of assembly.
Page 6
M 13 86 M 13 25 / M 13 26 Flügel Leaf Frame Rahmen max. 80mm M 13 86 Installation in wooden doors Processing of frame / leaf Flügel Leaf Rahmen Frame M 13 25 • Mill recess for lock plates radius 10 mm (3 mm deep) •...
M 13 25 M 13 26 Installation in tubular frame doors Installation in wooden doors Processing of frame / leaf Processing • Mill long slot width 20 mm and length 268 Frame: mm, corner radius max. 4 mm (28 mm deep •...
4 | Commissioning and Maintenance 5 | Disassembly and Disposal 4.1 Commissioning and function test 5.1 Disassembly The SmartLINK is activated by turning on the supply voltage (PWR). The SmartLINK is to be dismantled only in de-energised state. The master begins a scanning process for connected slave stations The dismantling of the screw plug-in terminals must be done in (master: Status LED flashes green).
7 | Attachment Connection example: Input switching (valid for the inputs IN1-8) Master: 12V - 24V Connection example: Schematic diagramm Input switching 1: Loop through the Signal transmitter voltage PWR Voltage Voltage 12V - 48V Input switching 2: Loop through the Signal transmitter voltage CHL Slave 1:...
Need help?
Do you have a question about the SmartLINK M 13 85 and is the answer not in the manual?
Questions and answers