Assembly; Gaskets; Tightening Torques; Preparing The Piston/Con Rod Assemblies - CITROEN SM Workshop Manual

Table of Contents

Advertisement

SM
V E H I C L E
A S S E M B L Y
I M P O R T A N T
G A S K E T S
A L L g a s k e t s m ust be s y s t e m a t i c a l l y ren ew ed
A l l g a s k e t s s h o u ld be f i t t e d
REINZ
( e x c e p t the
c y l i n d er-head g a s k e t s w h ic h m ust
be f i t t e d dry).
T I G H T E N I N G T O R Q U E S
On t h is e n g in e , a l l t i g h t e n i n g to rq u e s MUST
be r e s p e c t e d .
F a i l u r e to do t h is r e s u lt s in d e fo r m a tio n w h ic h
a d v e r s e ly a f f e c t s th e c o r r e c t ru n n in g of the e n g in e .
N O T E : N u ts an d b o lt s m us t be f i t t e d w i t h
t h e ir th re a d s o i le d .
20
When a s s e m b l in g the p i s to n s and con ro d s , the cha m fe r C s h o u ld be on the same s id e as the lo nger
s lo p e L .
- H e a t the con rod t o 200° - 2 5 0 ° C (392-482° F) (oven).
O V E R H A U L I N G
P A R T I C U L A R
P O IN T S
N O T E S
greased w i t h t a l l o w
P R E P A R I N G
T H E
P I S T O N / C O N
- P o s i t i o n the con rod in the p is to n (g u id e o f a s s e m b ly G of s e t 3 0 6 4 - T )
A N
E N G I N E
ON
D I S M A N T L I N G
A N D
C h e c k how fa r the ba rre ls are r e c e s s e d .
1) In r e l a t io n to the j o i n t face of the c y l i n d e r c a s in g
0.02 - 0.0 5 mm.
2) A m o n g s t t h e m s e l v e s , the ba rre ls s h o u ld be
in the same pla n e t o w i t h i n : 0.02 mm.
S t r a ig h t edge 16 9 8 -T + f o i l . C o r r e c t if
n e c e s s a r y w i t h to o l A from s e t 3064 - T
ROD
A S S E M B L IE S
S 100-3
9
A S S E M B L Y

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents