Raypak 302-902 Installation And Operating Instructions Manual page 31

H, wh and p series
Table of Contents

Advertisement

SECTION J-2
COMBUSTION
AIR FILTER
BOILER UNIT
HORIZONTAL THRU-WALL VENTING (CATEGORY III) TABLE
Horizontal Thru-wall Venting System (Category III) Installation
These installations utilize the boiler-mounted blower to vent the combustion products to the outdoors. Combustion air is
taken from inside the room and the vent is installed horizontally through the wall to the outdoors. Adequate combustion and
ventilation air must be supplied to the boiler room in accordance with the National Fuel Gas Code or, in Canada, the latest
edition of CAN/CGA-B149.1 and .2 Installation Code for Gas Burning Appliances and Equipment.
Horizontal Thru-Wall Venting (Category III)
CONDENSATE
TRAP
31
OPTIONAL FLUE
EXHAUST VENTING
9"
MIN.
FLUE EXHAUST
VENT CAP
INSULATED
EXHAUST
VENTING
12" MIN.
Fig. #9229.1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

302402502652752902

Table of Contents