Lektron BK 2020 1016 Installation Manual

Led lightband

Advertisement

BK 2020 1016
LED LIGHTBAND
INSTALLATION GUIDE
VER. 1.0
9/01/16
www.lektroninc.com
918.622.4978

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BK 2020 1016 and is the answer not in the manual?

Questions and answers

Summary of Contents for Lektron BK 2020 1016

  • Page 1 BK 2020 1016 LED LIGHTBAND INSTALLATION GUIDE VER. 1.0 9/01/16 www.lektroninc.com 918.622.4978...
  • Page 2: Table Of Contents

    Output 25 VAC the system call Lektron LED Technologies at 1-800-634-4059 immediately. Input 120 VAC It is recommended that you start your installation with a corner, and then...
  • Page 3: Getting Started, Contents, And Installation Check List 1. Component Identi Cation & Required Tools

    COMPONENT IDENTIFICATION & REQUIRED TOOLS SEC. 1 2.50 Die-stamped Aluminum Housing #12 x 2” Pre nished Hex Head Screw 191-7011 191-7022 #10 x 3/4” 16 Ga. Aluminum Housing Flat Red Polycarbonate Lens Hex Head Galvinized 8’ Length Continuous Length Screw Steel Red Lens 191-5003...
  • Page 4: Proper Measuring & Placement Of The Lightband

    PROPER MEASURING AND PLACEMENT OF THE LIGHTBAND SEC. 2 INSTALLING THE MOUNTING BRACKET INSTALLING THE CORNERS 1. Determine if your location is typical or high wind zone. 3. Install the rst 8' aluminum xture housing by aligning to the edge of the 2.
  • Page 5: Installation Of Cut Section & Sizing The Led

    INSTALLATION OF CUT SECTION & SIZING THE LED SEC. 3 END OF A RUN REINSTALLING THE LED BOARDS 1. Measure and eld cut last section. 1. Install LED chains into pre-installed clips. Be careful not to break the LEDs. 2. If this run dead ends into a wall or tower, allow ¼" space to insert an end cap 2.
  • Page 6: Setting The Transformer

    SETTING THE TRANSFORMERS SEC. 4 Note: Any primary voltage supply greater than 120, “STOP” call Lektron at 918-622-4978 1.Attach J-Boxes with supplied screws WIRE CONNECTIONS to available support member. 2.Attach Transformers inside of J-Boxes. .55 AMP PRIMARY LOAD SECURE ELECTRICAL BOX 3.Drill 7/8”hole through the housing.
  • Page 7: Testing Each Section

    TESTING EACH SECTION SEC. 5 IMPORTANT: DO NOT SKIP THIS STEP . ALWAYS CHECK ALL LED LIGHTS BEFORE CONTINUING. 1. Using the installed transformers, supply power to the LED light chains by connecting a temporary 120v connection to the black and white wires on the transformer to power the LED lights.
  • Page 8: Lens Installation

    LENS INSTALLATION SEC. 6 LENS SIZING, CUTTING, AND INSTALLATION LENS TRIM GUIDE The lens has a high expansion and contraction rate and therefore must Polycarbonate Lens Trim Length (Inches) be trimmed from the overall dimension in accordance with the lens trim for a Given Temperature and Length guide.
  • Page 9: End Cap Installation

    END CAP INSTALLATION SEC. 7 SILVER END CAP INSTALLATION SILVER CORNER CAP INSTALLATION 1. Fasten the silver end cap to the top of the housing using (2) #8 x ½” 1. Place top edge of end cap inside housing lip. silver self-tapping screws.
  • Page 10 www.lektroninc.com 918.622.4978 sales@lektroninc.com...