Output 25 VAC the system call Lektron LED Technologies at 1-800-634-4059 immediately. Input 120 VAC It is recommended that you start your installation with a corner, and then...
PROPER MEASURING AND PLACEMENT OF THE LIGHTBAND SEC. 2 INSTALLING THE MOUNTING BRACKET INSTALLING THE CORNERS 1. Determine if your location is typical or high wind zone. 3. Install the rst 8' aluminum xture housing by aligning to the edge of the 2.
INSTALLATION OF CUT SECTION & SIZING THE LED SEC. 3 END OF A RUN REINSTALLING THE LED BOARDS 1. Measure and eld cut last section. 1. Install LED chains into pre-installed clips. Be careful not to break the LEDs. 2. If this run dead ends into a wall or tower, allow ¼" space to insert an end cap 2.
SETTING THE TRANSFORMERS SEC. 4 Note: Any primary voltage supply greater than 120, “STOP” call Lektron at 918-622-4978 1.Attach J-Boxes with supplied screws WIRE CONNECTIONS to available support member. 2.Attach Transformers inside of J-Boxes. .55 AMP PRIMARY LOAD SECURE ELECTRICAL BOX 3.Drill 7/8”hole through the housing.
TESTING EACH SECTION SEC. 5 IMPORTANT: DO NOT SKIP THIS STEP . ALWAYS CHECK ALL LED LIGHTS BEFORE CONTINUING. 1. Using the installed transformers, supply power to the LED light chains by connecting a temporary 120v connection to the black and white wires on the transformer to power the LED lights.
LENS INSTALLATION SEC. 6 LENS SIZING, CUTTING, AND INSTALLATION LENS TRIM GUIDE The lens has a high expansion and contraction rate and therefore must Polycarbonate Lens Trim Length (Inches) be trimmed from the overall dimension in accordance with the lens trim for a Given Temperature and Length guide.
END CAP INSTALLATION SEC. 7 SILVER END CAP INSTALLATION SILVER CORNER CAP INSTALLATION 1. Fasten the silver end cap to the top of the housing using (2) #8 x ½” 1. Place top edge of end cap inside housing lip. silver self-tapping screws.