GECMA CHALLENGER 15 Inch Operating And Installation Instructions

GECMA CHALLENGER 15 Inch Operating And Installation Instructions

Remote pc terminals

Advertisement

Operating and Installation Instructions
Remote PC Terminals
CHALLENGER 15"
CHALLENGER 18"
GECMA COMPONENTS GMBH
WWW.GECMA.COM
TEL. +49 2237 6996-0
FAX. -99
MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC
31.01.07
A.J
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CHALLENGER 15 Inch and is the answer not in the manual?

Questions and answers

Summary of Contents for GECMA CHALLENGER 15 Inch

  • Page 1 Operating and Installation Instructions Remote PC Terminals CHALLENGER 15” CHALLENGER 18” GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 2: General Reference

    The information in the Certificate of Conformity should be fully adhered to. If you have any questions or suggestions please contact your local representative or us directly: Gecma Components GmbH Gecma International Ltd Heisenbergstraße 26 – 40 Meridian House, Roe Street...
  • Page 3 Repairs, Dangerous chemicals A note detailing the fault must always accompany equipment sent to GeCma Components GmbH or any of their agents for repair. The following procedures must be carried out before a unit is sent back for repair: Remove all residues that may be present. Pay special attention to the gasket grooves and crevices where residue may collect.
  • Page 4: Table Of Contents

    Earthing between the STF or EBF Stands and the FH or FHP Enclosure............ 24 Complete Wiring Details ..........................25 Operation and adjustment of the display ....................32 Options ................................33 Technical data ..............................34 GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC...
  • Page 5: Introduction

    PSU2 Power supply unit for the TCV2 19” rack 15-PSU Power supply for the CHALLENGER 15-FMO 18-PSU Power supply for the CHALLENGER 18-FMO GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 6: Application

    600m or more (400m in the case of the 18) from the actual PC CPU (at distances of 400m or more the resolution and the display refresh rate must be reduced). GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX.
  • Page 7: Design Of The 15-Psu/18-Psu

    PS 1 & PS 6 & PS 7 (0 V) Supply circuit Cable2 1 OUTPUT 2 V+ K1(4+16) & K2(1) PS 1 & PS 6 & PS 7 (+12 V) GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 8: Design Of The Challenger 15 - Fmo Display Module

    Supply PS7- (0 V) Not used Preferred Terminal block K3: Connection: cable-No. Cable1 1 Supply PS8+ (+12) Cable1 2 Supply PS8- (0 V) Not used GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 9 OSD keyboard SUB menu OSD keyboard UP OSD keyboard Down OSD keyboard menu OSD keyboard GND The adjustment potentiometers and the four-key keypad are described in “Commissioning“. GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 10: Design Of The Challenger 18 - Fmo Display Module

    Supply PS7- (0 V) Not used Preferred Terminal block K3: Connection: cable-No. Cable1 1 Supply PS8+ (+12) Cable1 2 Supply PS8- (0 V) Not used GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 11 OSD keyboard SUB menu OSD keyboard UP OSD keyboard Down OSD keyboard menu OSD keyboard GND The adjustment potentiometers and the four-key keypad are described in “Commissioning“ GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 12: Design Of The Challenger Kb Keyboard

    : 429 x 165 x 60 mm (w x h x d) Weight : 2.0 kg Membrane material : Technoplast – resistant to most solvents GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC...
  • Page 13 K9 (2) connected to K9 (1) Scannerc. (2) RS232-RxD Scannerc. (3) 0V for RS232 peripheral RS232-DSR RS232-CTS RS232-TxD RS232-DTR Scannerc. (4) RS232-GND RS232-RTS GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 14: Design Of The Challenger M Mouse Module

    : 98 x 165 x 40.5 mm (w x h x d) Weight : 0.45 kg The connections are detailed in the following table. Connection cable Connection Brown White Yellow Data Green Clock GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 15: Design Of The Challenger Tb Trackball Module

    : 98 x 165 x 40.5 mm (w x h x d) Weight : 0.45 kg The connections are detailed in the following table. Connection cable Connection Blue Green Data White Clock GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 16: Design Of The Challenger Mtd

    The connections are detailed in the following table. CHALLENGER CHALLENGER CHALLENGER M CHALLENGER TB Preferred -FMO cable-No. Terminal- Terminal- Terminal- Terminal- cable cable Block K11 Block K12 Block K4 Block K9 GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 17: Design Of The Tcv2 Data Transmission Card

    If cable runs are longer than 275m, the following jumpers on the TRV 2 must be closed: JP1 to JP12 JP10 JP11 JP12 Circuit board TRV2 GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 18: Challenger

    1. Twisted pair (a) 1. Twisted pair (b) 2. Twisted pair (a) 2. Twisted pair (b) 3. Twisted pair (a) 3. Twisted pair (b) GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 19: Design Of The Psu2 Power Supply Unit

    100-240VAC (L) 100-240VAC (L) The mains power supply should not be connected directly to the connector pins. It should be connected via a normal mains power supply filter. GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC...
  • Page 20: Design Of The 19" Rack (Optional)

    Twisted pair 3 a orange Twisted pair 3 b white Twisted pair 4 a blue Twisted pair 4 b Screen Screen Screen Screen GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 21: Software For The Tcv2 And Kb

    OSD mode is automatically deactivated 30 sec. after the last key stroke. 8. Optical indication of activated OSD mode If OSD mode is active, all three LEDs on the local and remote keyboard flash at a frequency of 1Hz. GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC...
  • Page 22: Installation

    The cable between the 15-PSU or 18-PSU and the CHALLENGER FMO must be no more than 10 m length when the cable cross-section is 1mm² . GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX.
  • Page 23: Installation Of Challenger Pc Terminals Supplied In Pre-Wired Enclosures

    3. Twisted pair (a) orange 3. Twisted pair (b) Screen Screen Screen Screen white 4. Twisted pair (a) blue 4. Twisted pair (b) GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 24: Earthing Between The Stf Or Ebf Stands And The Fh Or Fhp Enclosure

    PSU2 card will then light up. Terminate the data cable to the 10 pole phoenix connector supplied and plug into the socket on the back of the Rack 84-2 or Rack 42-2 rack GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX.
  • Page 25: Complete Wiring Details

    Cable2 2 OUTPUT V- Preferred Terminal Supply circuit Terminal block K3 cable-No. 15-PSU CHALLENGER 15 - FMO Cable1 1 OUTPUT V+ Cable1 2 OUTPUT V- GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 26 Input-Voltage for several modules is achieved by connecting them in parallel. Input-Voltage: Connection: INPUT L (L) 100-240V AC (optional +24VDC) INPUT N (N) 100-240V AC (optional 0VDC) INPUT Earth Earth connection GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 27 Screen 7 Screen Screen Screen 8 Screen Make sure the screen maintains a sufficient safety/insulation distance. GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 28 19“ units yourself, the power supply for the TCV2 must also be connected. Use a mains filter for the mains power. TCV2 PSU2 10DZ 12DZ 14DZ 10DZ 12DZ PSU2 Versorgung 32 DZ 100-240VAC (L) 30 DZ 100-240VAC (N) 28 DZ GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 29 For this purpose three DIP switches S5 to S7 are used. All three switches must be set in the same position to work correctly. For cable runs over 275m, several additional jumpers on the TCV2 are already set from GECMA Components (further details see “Design of the TCV2 data transmission card“).
  • Page 30 An increase in time of up to 15ns can be achieved by combining DIP switches 1-4 in binary notation. The shift in the individual colours can be noticed on the test picture “Längenabgleich.bmp“ and the optimum times for the colours blue/green and red adjusted accordingly. GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC...
  • Page 31 Screen Display (OSD) selection appears on the display when the Menu button is pressed, or by using the key combination Ctrl + 0, S, D. Rear view of 18“ display Test picture: Längenabgleich.bmp GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC...
  • Page 32: Operation And Adjustment Of The Display

    Increase the value of the parameter (e.g. brightness) ← Reduce the value of the parameter (e.g. brightness) ↓ Sub-Menu key Select a SUB menu item GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...
  • Page 33: Options

    Note that it is also possible to connect a Monitor, Keyboard and Mouse to the last TCV card for local operation in the switch room. These function in the same way as a Monitor, Keyboard and Mouse of a Challenger Terminal. GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX.
  • Page 34: Technical Data

    : ( 460 x 525 x 200 ) mm and ( 261 x 626 x 78 ) mm Material : Stainless Steel 1.4301 Finish : Stainless Steel ground to hygienic standards Ingress protection : IP66 (NEMA 4X) Weight : 23 kg GECMA COMPONENTS GMBH WWW.GECMA.COM TEL. +49 2237 6996-0 FAX. -99 MANUAL CHALL 15_18 EN REV.1.3.NEX.DOC 31.01.07...

This manual is also suitable for:

Challenger 18 inch

Table of Contents