Rittling RH-24 Installation Operation & Maintenance

Rittling RH-24 Installation Operation & Maintenance

Unit heaters for steam or hot water

Advertisement

General Information:

Installation and service instructions in this manual are
applicable to the steam/hot water unit heaters which should
be installed in their proper applications for their most
effective function as overhead heating units. The copper coils
are warranted for operation at steam or hot water pressures
up to 180 psig, and/or temperatures up to 360°F. National
Electric Code (NEC) or Canadian Electric Code (CEC)
ignition temperature rating T3B for grain dust.
DO NOT REMOVE OUTLET FAN GUARD FROM
MODEL RV UNITS.
Rittling Unit Heaters - Installation, Operation & Maintenance
For Steam or Hot Water
Installation, Operation & Maintenance
Inspection on Arrival:
1.
Inspect unit upon arrival. In case of damage, report
immediately to transportation company and your local
Rittling Sales Representative.
2.
Check rating plate on unit and motor to verify that power
input and motor specification meet available electric
power at point of installation.
3.
Inspect unit received for conformance with description
of product ordered (including specifications where
applicable).
INSTALLER'S RESPONSIBILITY
Installer Please Note: This equipment has been test fired
and inspected. It has been shipped free from defects from
our factory. However, during shipment and installation,
problems such as loose wires, leaks, or loose fasteners
may occur. It is the Installer's responsibility to inspect
and correct any problems that may be found.
1
UNIT HEATERS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RH-24 and is the answer not in the manual?

Questions and answers

Summary of Contents for Rittling RH-24

  • Page 1: General Information

    However, during shipment and installation, problems such as loose wires, leaks, or loose fasteners may occur. It is the Installer’s responsibility to inspect and correct any problems that may be found. Rittling Unit Heaters - Installation, Operation & Maintenance...
  • Page 2: Installation

    Models RV-193 through V-610 have angle-iron frame mounting brackets for heavy-duty installation with 4-Cone Anemostat applicable hardware. Horizontal Air Delivery Truncone Rittling Unit Heaters - Installation, Operation & Maintenance...
  • Page 3: Piping Installation

    Any damage to or failure of Rittling units caused damage. All units must be wired strictly in accordance with by incorrect wiring of the units is not covered by Rittling’s wiring diagram.
  • Page 4: Operation

    Check for proper rotation of fan. All fans must rotate in a counterclockwise direction when viewed from the back (RH) of the unit heater. Rittling Unit Heaters - Installation, Operation & Maintenance...
  • Page 5: Maintenance

    Check Open Gravity or Vacuum Return System fan for proper clearance, free rotation and firm connection to shaft. When servicing is complete, tag unit to indicate date of inspection and cleaning. Rittling Unit Heaters - Installation, Operation & Maintenance...
  • Page 6: Warranty

    Provide controlled water treatment — don’t use excess of boiler Hydro-Air Components, Inc., manufacturer of the Rittling product line, guarantees this product to be compounds. Contact your boiler compound supplier for proper free from defects in material and workmanship for usage or the services of a water treatment laboratory.