Spectrum GCB-24R Installation And Operating Instruction Manual

Gas countertop char broiler

Advertisement

Quick Links

Installation and operating Instruction Manual
GCB-24R
WIDTH
MODEL
IN. (MM)
GCB-24R 24" (610 mm) 26.8" (680 mm) 15.6" (398 mm)
GCB-36R 36" (915 mm) 26.8" (680 mm) 15.6" (398 mm)
Note: Depth direction includes the regulator size.
CHAR BROILER SURFACE DIMENSIONS
MODEL
GCB-24R
GCB-36R
BEFORE OPERATING ANY EQUIPMENT, READ AND FAMILIARIZE YOURSELF WITH THESE USE AND SAFETY INSTRUCTIONS
Congratulations on your purchase of SPECTRUM commercial cooking equipment. SPECTRUM takes pride in the design
and quality of our products. When used as intended and with proper care and maintenance, you will experience years of
reliable operation from this equipment. To ensure best results, it is important that you read and follow the instructions in
this manual carefully. It's important to save these instructions for future reference.
CHAr BroILer
GCB-36R
DEPTH
HEIGHT
IN. (MM)
IN. (MM)
WIDTH - IN. (MM)
24" (610 mm)
36" (915 mm)
GAS Countertop
Conforms to ANSI STD
Z83.11b-2009(R2012)
Certified to CSA
STD 1.8b-2009(R2012)
3182799
# OF
BTU/PER
BURNERS
NAT/LP
2
40,000
3
40,000
DEPTH - IN. (MM)
TOTAL
PRESSURE
BTU/HR
IN. W.C
80,000
6 / 10
120,000
6 / 10
20" (510 mm)
20" (510 mm)

Advertisement

Table of Contents
loading

Summary of Contents for Spectrum GCB-24R

  • Page 1: Specifications

    BEFORE OPERATING ANY EQUIPMENT, READ AND FAMILIARIZE YOURSELF WITH THESE USE AND SAFETY INSTRUCTIONS Congratulations on your purchase of SPECTRUM commercial cooking equipment. SPECTRUM takes pride in the design and quality of our products. When used as intended and with proper care and maintenance, you will experience years of reliable operation from this equipment.
  • Page 2: Warnings

    Countertop Gas Char Broiler Important For Future Reference Please complete this information and retain this manual for the life of the equipment. For Warranty Service and/or parts, this information is required. Model Number Serial Number Date Purchased WARNING: For your safety, do not store or use gasoline AVERTISSEMENT: Pour votre sécurité, ne pas stocker ni or other flammable vapors or liquids in the vicinity of utiliser d'essence ou d'autres vapeurs ou liquides...
  • Page 3: Table Of Contents

    Spare.Parts.List................11 Limited.Warranty............... 12 Introduction Congratulations on the purchase of your SPECTRUM machine. Please take All containers should be examined for damage before and during unloading. time to carefully read through this manual to ensure the machine is operated The freight carrier has assumed responsibility for its safe transit and delivery.
  • Page 4: Safety.precautions

    2. Clean any glue residue left over from the plastic or tape. 3. Place the unit in the desired position and height. SPECTRUM prides itself on quality and service, ensuring that at the time of packing, all products are supplied fully functional and free of damage.
  • Page 5: Installation

    Il doit y avoir un espace suffisant pour le retrait de la face avant. Toutes les parties 3. Place the SPECTRUM Gas Char Broiler on a firm level surface. Local principales à l'exception des brûleurs sont amovibles à travers l' a vant si la conduite standards and regulations should be consulted in order to abide by de gaz est coupée.
  • Page 6: Conversion

    Conversion These instructions are for the conversion from Natural Gas to Propane (L.P.) 4. Remove the nuts for U Burners. on all models. The conversion should be done before connecting the unit to the gas supply. Units are shipped from the factory equipped for use on natural gas. Orifices necessary for Propane (L.P.) are included with the unit.
  • Page 7: Lighting

    MAIN BURNER AIR SUPPLy Conversion 5. For efficient burner operation, a proper balance of gas volume and primary air supply must be maintained, which will result in complete 7. Converting the gas regulator: combustion. Insufficient air supply results in a yellow streaming flame. A.
  • Page 8: Operation

    Operation Cleaning, Care & Maintenance Before operating the char broiler, it must be checked to see that it INITIAL CLEANING is sitting level. Adjust the feet to level the char broiler. Be sure the Prior to operating your new char broiler, thoroughly wash the exterior with waste tray has been assembled correctly.
  • Page 9: Troubleshooting

    Troubleshooting If your SPECTRUM Gas Char Broiler does not operate, please check the following before placing a service call. ISSUE MIGhT BE CAUSED By RECOMMENDED SOLUTION Pilot burner not lit. Turn-ON pilot burner, then light up the main burner. Heat does not come on when valve is turned on Gas valve is bad.
  • Page 10: Exploded.view

    Exploded View MODEL GCB-36R...
  • Page 11: Spare.parts.list

    Exploded View & Spare Parts List MODEL GCB-24R MODEL GCB-36R MODEL GCB-24R DESCRIPTION PART # PART # Cooking Grate GCB-P1 GCB-P1 S/S radiant GCB-P2 GCB-P2 12” Cast Radiant Kit GCB-P3 GCB-P3 (Optional) Regulator GHP-P3 GHP-P3 Burner GCB-P5 GCB-P5 Foot GHP-P5...
  • Page 12: Limited.warranty

    Limited Warranty REGISTER ONLINE AT: WINCO warrants to the original purchaser of new equipment that said equipment, when installed in accordance with our instructions within http://support.wincous.com North America and subjected to normal use, is free from defects in Proof of purchase is required to extend warranty more than 1 year from material or workmanship for a period of 1 year.

This manual is also suitable for:

Gcb-36r

Table of Contents