Summary of Contents for Edwards 100 Ton Deluxe Ironworker
Page 1
Installation Manual Original Instructions - IW100DX01...
Page 2
All rights reserved. Reproduction of this manual in any form, in whole Indicates a hazardous situation that, if not avoided, or in part, is not permitted without the written consent of Edwards Receiving the Ironworker could result in mild or moderate injury.
Page 3
55 Ton 60 Ton 65 Ton Edwards Ironworking machinery is fully assembled and is shipped ei- hoses. Electrical Requirements at Work Station ther by palletized custom wooden crate or by shrink–wrapped wooden 75 Ton...
Page 4
Starting Box Wiring Provide the electrical schematic wiring diagram (located within the Ironworker control box) to your Electrician prior to initiating the electrical hookup of the machine. Power up the Ironworker With all stations clear of tools, tooling or debris, power up the Ironworker by depressing the green button on the starter box.
Need help?
Do you have a question about the 100 Ton Deluxe Ironworker and is the answer not in the manual?
Questions and answers