Download Print this page

RX EPA 2000 Installation Instructions Manual

Power analyzer

Advertisement

Quick Links

CAUTION ● CAUTION ● CAUTION
R
EAD THROUGH THE INSTRUCTIONS
CAREFULLY BEFORE TURNING ON
R
M
X
T
ELEPHONE
\\S
\I
I
\I
I
ERVER
NSTALL
NST
NSTALLATION
NSTRUCTIONS
I
NSTALLATION
OF THE
VOLTAGES PRESENT
POWER TO
THIS INFORMATION IS PROPERTY OF
S
, LLC · 22A E
ONITORING
ERVICES
: (603) 666-6606 · T
\EPA2000_B
_I
REAKOUT
NSTRUCTIONS
P
OWER
P
A
OWER
A
. · B
ASTMAN
VE
S
: (603) 930-3316 · W
ECH
UPPORT
.
DOC
I
NSTRUCTIONS
A
NALYZER
NALYZER
:
, NH 03110-6701
EDFORD
:
.
.
EB
WWW
RXMS
COM

Advertisement

loading

Summary of Contents for RX EPA 2000

  • Page 1 NSTALLATION NSTRUCTIONS OF THE OWER NALYZER CAUTION ● CAUTION ● CAUTION VOLTAGES PRESENT EAD THROUGH THE INSTRUCTIONS CAREFULLY BEFORE TURNING ON POWER TO OWER NALYZER THIS INFORMATION IS PROPERTY OF , LLC · 22A E . · B , NH 03110-6701 ONITORING ERVICES ASTMAN...
  • Page 2 EPA 2000 NPACK STEP 1 • U EPA 2000 NPACK THE MONITOR AND POSITION NEAR THE CONNECTION POINT TO BE TESTED • B E CAREFUL NOT TO BLOCK COOLING VENTS • P EPA 2000 OSITION THE WHERE IT WILL NOT BE...
  • Page 3 EPA 2000 ETUP STEP 1 • T URN OFF THE IRCUIT REAKER TO THE SYSTEM SHUTTING THE POWER OFF TO THE SYSTEM • H L1, L2 OOK UP THE LEADS CLIP OR STRIP ’ THE SYSTEM S BREAKER AND LEAD TO THE EUTRAL BAR •...
  • Page 4 EPA 2000 ETUP STEP 2 • H L1, L2, L3, N OOK UP THE URRENT PROBES TO ROUND MAKING SURE THAT THERE IS ONLY ONE WIRE IN THE CLAMP URRENT PROBE LSO MAKE SURE THAT THE CLAMP IS CONNECTED TO THE CORRECT WIRE AND...
  • Page 5 EPA 2000 REAKOUT ABLE ONNECTIONS • T A/C C URRENT PROBES ARE A CLAMP ON TYPE THAT CAN BE ATTACHED TO CONDUCTORS QUICKLY AND SAFELY • C URRENT PROBES SHOULD BE CONNECTED TO THE ACCESSIBLE HASE ONDUCTORS EUTRAL WHITE ONDUCTOR...
  • Page 6 EPA 2000 REAKOUT ABLE ONNECTIONS • R PROVIDES SPECIAL REAKOUT ABLES TO ASSIST IN SAFE FAST AND SIMPLE CONNECTION OF THE 2000 P OWER NALYZER • V ARIOUS REAKOUT ABLE TYPES ARE AVAILABLE MS @ ONTACT 603-666-6606 IF THE REAKOUT...
  • Page 7 EPA 2000 ETUP STEP 4 • T URN ON THE REAKER TO THE EQUIPMENT • P START EPA 2000 RESS THE GREEN BUTTON ON THE GREEN LIGHT SHOULD COME ON OU ARE DONE STEP 5 • M ’ HVAC ONITOR FOR...
  • Page 8 " ( WILL OWER IT MAY TAKE UP ). PLEASE DO NOT MOVE THE SECONDS EPA 2000 UNTIL THE UNIT HAS FULLY POWERED DOWN AND ALL THE LIGHTS AND FANS ARE OFF. • C EPA 2000, ALL AREFULLY PACK UP THE...