Download Print this page

Advertisement

Quick Links

Bauer NE
Thank You for purchasing the
convenience and security. We are a family owned company with over 50 years of service in the locking
hardware industry, and we are grateful for the opportunity to serve you. Please review and follow the
Installation, Programming, and Operating Instructions to ensure proper function.
Bauer NE
The

features:

The first self-contained electronic RV latch with Capacitive Touch Technology.
An integral touch pad to the latch which controls the dead bolt.
It is powered by 4 AA batteries.
Is retrofitable in most RV entry doors, and is easy to install.
Programmable with a 4 digit PIN number.
The large buttons are easy to see and use.
Proximity sensing which illuminates the buttons.
An Intelligent Keyless Entry System which knows the position of the deadbolt and indicates low
battery strength, as well as providing audible feedback to successful locking and unlocking functions.
The key will always be able to operate the paddle or dead bolt lock in case of the user forgetting the
code or dead battery
Bauer NE

Installation Instructions:

The following steps are graphically shown on the enclosed
1.
Remove old lock.
2. Clean cut-out. Remove any dirt, loose material, etc.
3. Install outside housing (the portion that includes the Touch Pad) with the dead bolt in the
unlocked position.
4. Attach the (2) 8x32 screws into the portion of the handle that has the Plunger and Dead
Bolt. This is on the edge of the door.
5. Plug wire from Inside Plate Assembly into the receptacle on the housing. DO NOT PICK UP
Inside Plate Assembly BY PLUG. Make sure to align the tab on the plug properly with
the slot on the receptacle. The plug should make a slight click when properly engaged.
6. Tuck Battery Wires into pocket next to Stamped Steel Plate. Do not allow Battery Wires to
get between Inside Plate Assembly and Stamped Steel Plate as it will cause the motor to
bind.
7. Align the Dead Bolt Knob in the unlocked position. The Red Dots on the Dead Bolt Knob
and the Inside Plate Assembly should be aligned to indicate the unlocked position of the
Dead Bolt. Slide Dead Bolt Knob over D-Stem and align the 4 screw bosses on the housing
with the attaching holes on the Inside Plate Assembly. When Inside Plate Assembly is in
position with Housing install the (4) 8x32 Screws. Secure but do not over tighten screws.
Bauer NE
.. We have developed the
BP
Bauer Products, Inc.
702 Evergreen St SE
Grand Rapids, MI 49507
1-866-68-BAUER(22837)
(616) 245-4540
(616) 245-0131 fax
Bauer NE
with the idea to increase your
Bauer NE
Installation schematic.

Advertisement

loading

Summary of Contents for Bauer NE

  • Page 1 Bauer Products, Inc. 702 Evergreen St SE Grand Rapids, MI 49507 1-866-68-BAUER(22837) (616) 245-4540 (616) 245-0131 fax Bauer NE Bauer NE Bauer NE Thank You for purchasing the .. We have developed the with the idea to increase your convenience and security. We are a family owned company with over 50 years of service in the locking hardware industry, and we are grateful for the opportunity to serve you.
  • Page 2  Page 2 March 23, 2015 Battery Installation: Bauer NE uses 4 AA batteries for operation. We do not recommend zinc carbon batteries for this application. Batteries not included. Fresh batteries should be installed as necessary. Battery Life is highly dependent upon battery quality, usage, and environment (temperature).
  • Page 3 Make sure there are no obstructions in the door frame to prevent Dead Bolt extension.  Do not wash with power washer or high pressure cleaner. The Bauer NE is designed to resist water intrusion to protect its electrical components from normal water encounter such as rain.
  • Page 4 PROVISION TO THE CONTRARY, THIS LIMITED WARRANTY IS MADE UPON THE EXPRESS UNDERSTANDING THAT IT SHALL APPLY IN CONNECTION WITH THE SALE OF THE PRODUCT BY BAUER AND IS IN LIEU OF ALL OTHER WARRANTIES (EXPRESS, IMPLIED OR STATUTORY) INCLUDING THE SEPARATE WARRANTIES OF MERCHANTABILITY AND FITNESS...
  • Page 5  Page 5 March 23, 2015 Installation and Operation Videos available at www.bauerproducts.com...
  • Page 6  Page 6 March 23, 2015 Installation and Operation Videos available at www.bauerproducts.com...