SolrenView PVI 23TL Installation Manual

Pvi 14-36tl

Advertisement

SolrenView Installation Guide
PVI 14-36TL Series
SolrenView Installation Guide
for PVI 14-36TL Inverters
Revision A
©2015, Solectria – A Yaskawa Company
DOCR-070580-A
Page 1 of 5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PVI 23TL and is the answer not in the manual?

Questions and answers

Summary of Contents for SolrenView PVI 23TL

  • Page 1 SolrenView Installation Guide PVI 14-36TL Series SolrenView Installation Guide for PVI 14-36TL Inverters Revision A ©2015, Solectria – A Yaskawa Company DOCR-070580-A Page 1 of 5...
  • Page 2 SolrenView Installation Guide PVI 14-36TL Series This installation guide provides instructions on installing the SolrenView monitoring DAS into the inverter. Required tools: 3mm Allen wrench (non-powered) #2 Phillips screwdriver REMOVING THE WIRING BOX COVER PVI 23/28/36TL Inverters 1. Disconnect AC/DC disconnects.
  • Page 3 SolrenView Installation Guide PVI 14-36TL Series REMOVING THE WIRING BOX COVER PVI 14/20TL Inverters 1. Disconnect AC/DC disconnects. 2. Wait 5 minutes for capacitors to discharge. 3. Note that all fuses are still live. 4. Use standard electrical safety practices while performing the job.
  • Page 4 SolrenView Installation Guide PVI 14-36TL Series SOLRENVIEW INSTALLATION INSTRUCTIONS PVI 23/28/36TL Add Ethernet connection prior to mounting DAS. Pre-bend the wire harness as shown. Place the data logger in its location. Insert the provided hardware in the 4 locations shown. Correct Connect the 5 pin green connector.
  • Page 5 SolrenView Installation Guide PVI 14-36TL Series SOLRENVIEW INSTALLATION INSTRUCTIONS PVI 14/20TL Loosen and discard right standoff. Add Ethernet connection. Insert the provided hardware in the 3 locations shown. Correct sequence: screw, lock washer, flat washer. Connect the 5 pin green connector.

This manual is also suitable for:

Pvi 28tlPvi 36tlPvi 14tlPvi 20tl

Table of Contents