Download Print this page

Nurseryworks Aerial Crib Conversion Kit Instruction Manual

Advertisement

Quick Links

Instruction Manual
Congratulations!
You are now the owner of a Nurseryworks
product...a line of modern baby furniture that
redefines the nursery. Nurseryworks' products
are designed with both style and functionality
in mind, and we hope it becomes a source of
pleasure for you and your family. Quality material,
workmanship and pride have gone into these
products. Proper assembly is important to
ensure a safe and comfortable end result for
your baby. Please read all instructions before
assembly, and keep instructions for future use.
revised 10NOV2011

Advertisement

loading
Need help?

Need help?

Do you have a question about the Aerial Crib Conversion Kit and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Nurseryworks Aerial Crib Conversion Kit

  • Page 1 AERIAL CRIB CONVERSION KIT Instruction Manual Congratulations! You are now the owner of a Nurseryworks product...a line of modern baby furniture that redefines the nursery. Nurseryworks’ products are designed with both style and functionality in mind, and we hope it becomes a source of pleasure for you and your family.
  • Page 2 WARNING ENTRAPMENT/ STRANGULATION HAZARD • Infants have died in toddler beds from entrapment and strangulation. • NEVER use bed with children under 15 months. • Guardrails must be used to avoid the formation of a gap between the mattress and the bed that could cause an entrapment.
  • Page 3 Aerial Crib Conversion Kit Hardware and Parts List D x 1 Wrench Screw E x 5 (35mm/1.4”) Screw F x 8 (25mm/1”) G x 4 Metal Plate H x 5 Washer Conversion Kit Please note that screw F requires a Phillips Head Screw driver which is not provided.
  • Page 4 Installation of Conversion Kit Unscrew screw A with wrench D and take out the mattress board and one of crib slate panel...
  • Page 5 Installation of Conversion Kit Insert screw E and washer H from the inside of the mattress board to connect the conversion kit...
  • Page 6 Installation of Conversion Kit Identify the correct metal plates which are on the crib ends by standing in front of the Crib. Then unscrew four original metal plates.
  • Page 7 Installation of Conversion Kit Identify the four metal plates G . Insert two of screw F into metal plate G , through the corresponding holes as drawing illustrates .
  • Page 8 Installation of Conversion Kit Then place the mattress board with the conversion kit top of bracket C, matching up the pre-drilled screw holes. Insert screw A (existing screw on the mattress support board) into the hole, connecting the bracket C and tighten screws A with wrench D, this should be done on all four brackets.