Professional series racks complete rack with casters, power strip, thermal control and dual fans (4 pages)
Summary of Contents for DirectConnect DCBAR42U
Page 1
DirectConnect® custom system integrators with a full line of multi-use Houston, TX 77027 Professional Racks that deliver extraordinary capabili- 800.531.3224 ww.DirectConnectHome.com ties in construction and performance. ® ** DirectConnect is a registered trademark ® ** DirectConnect is a registered trademark...
Page 2
Series Racks. Only someone with good mechanical aptitude, who has The DirectConnect® Professional Series mounting rails 10-32 pre - threaded experience with basic building construction, and who fully holes. These mounting rails are labeled in EIA standard rack space increments allowing for easy equipment alignment.
Page 3
Step 3: Unpacking Carton 3 of 3 and assemble Top & Base Assembly to rack. 1.0 HARDWARE LIST Installing the Top and Base Assemblies, Legs, and Base Cable Plates (as needed) to rack assembly. Actual parts appearance and quantity may differ from illustration. Using six (6) Phillip screws (D) attach the Top Assembly as unpacked from carton 1 of 3 and attach to Rack Assembly as shown in Figure 4.
Among those benefits and features you will find: CAUTION: DirectConnect® Professional Series Racks are intended only with the maxi- mum weights indicated. See apparatus instructions. Use with products heavier than Quick and easy to assemble design allows for flat shipment the maximum weights indicated may result in instability, causing possible injury.
Need help?
Do you have a question about the DCBAR42U and is the answer not in the manual?
Questions and answers