Download Print this page

CAC / BDP 018 Installation Instructions Manual page 3

Gb series geothermal heat pump

Advertisement

APPLICATION
CONSIDERATIONS
Earth Coupled
(Geothermal)
Systems
Closed
loop
and
pond
@plications
require
specialized
design
knowledge.
No attempt at these installations
should be made unless
the dealer has received
specialized
training.
Anti-freeze
solutions
are utilized when
low evaporating
conditions
are expected
to occur.
Refer
to the
Flow
Center
installation
manuals
for more specific instructions.
10
Fig. 1 - Earth Coupled
Application
EARTH COUPLED
APPLICATION
1.
LINE VOLTAGE
DISCONNECT
(UNIT)
2.
FLEX DUCT CONNECTION
3.
LOW VOLTAGE
CONTROL
CONNECTION
4.
LINE VOLTAGE
CONNECTION
(UNIT)
5.
PIT PORTS
6.
VIBRATION
PAD
7.
CONDENSATE
DRAIN
8.
GROUND
LOOP CONNECTION
KIT
9.
GROUND
LOOP PUMPING
PACKAGE
10.
POLYETHELENEWITH
INSULATION
11.
LINE VOLTAGE
DISCONNECT
(ELECTRIC
HEATER)
A14161

Advertisement

loading

This manual is also suitable for:

024042048030036060