Summary of Contents for Rokenbok Young Engineer Start Set
Page 2
drawbridge pg. 1 114x elevator pg. 8 160x gantry crane pg. 21 gear crane pg. 32 Color of building pieces may differ from those shown.
Page 3
• Rokenbok recommends premium alkaline batteries for use in your Rokenbok machines. • Batteries are to be inserted with correct polarity as shown. • Do not mix old and new batteries. • Do not mix alkaline, standard (carbon-zinc), or nickel-cadmium batteries.
Page 10
Final ASSEMBLY: Assembling the winch string to the drawbdige. Tip: To let additional string out press the “A” button on your ROK Star Controller. 1. Guide the string from the winch cable guide over the pulley marked “B”. 2. Guide the string through the pulley marked “C”. 3.
Page 23
final assembly Attaching the winch string to the elevator 1. Guide the string from the cable guide up and over pulleys marked "A" and "B". 2. Guide string down and under pulley marked "C". 3. Guide string back up to the pulley marked "D". 4.
Page 42
Gear crane extension - elevator final elevator assembly...
Page 43
FINAL ASSEMBLY/STRINGING GEAR CRANE Note: Cut the second string in half before you begin. You will need both halves. A. Axle Spool: Lifts lighter loads quickly. Tie the string around the middle of the Route the string up and over Bring the string down and attach it axle spool and activate the Axle Drive.
Need help?
Do you have a question about the Young Engineer Start Set and is the answer not in the manual?
Questions and answers