Download Print this page
Rokenbok Young Engineer Start Set Instructions Manual

Rokenbok Young Engineer Start Set Instructions Manual

Maker series

Advertisement

Quick Links

Advertisement

loading
Need help?

Need help?

Do you have a question about the Young Engineer Start Set and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Rokenbok Young Engineer Start Set

  • Page 2 drawbridge pg. 1 114x elevator pg. 8 160x gantry crane pg. 21 gear crane pg. 32 Color of building pieces may differ from those shown.
  • Page 3 • Rokenbok recommends premium alkaline batteries for use in your Rokenbok machines. • Batteries are to be inserted with correct polarity as shown. • Do not mix old and new batteries. • Do not mix alkaline, standard (carbon-zinc), or nickel-cadmium batteries.
  • Page 4 BILL OF MATERIALS...
  • Page 10 Final ASSEMBLY: Assembling the winch string to the drawbdige. Tip: To let additional string out press the “A” button on your ROK Star Controller. 1. Guide the string from the winch cable guide over the pulley marked “B”. 2. Guide the string through the pulley marked “C”. 3.
  • Page 11 Bill of materials BILL OF MATERIALS...
  • Page 16 Slide into place.
  • Page 22 19 19...
  • Page 23 final assembly Attaching the winch string to the elevator 1. Guide the string from the cable guide up and over pulleys marked "A" and "B". 2. Guide string down and under pulley marked "C". 3. Guide string back up to the pulley marked "D". 4.
  • Page 24 BILL OF MATERIALS...
  • Page 30 Feed the x2 onto your gantry crane Remove half beam assembly (as shown). Turn X2 upside down (as shown). Using the ROK Star Controller directional wheel, press forward and feed X2 onto Gantry Crane. Replace half beam assembly (as shown).
  • Page 31 GANTRY CRANE EXTENSION - TRAILER...
  • Page 32 SIDE A SIDE B...
  • Page 33 FINAL ASSEMBLY Additional GANTRY CRANE EXTENSION - Bucket and Hook...
  • Page 34 FINAL ASSEMBLY with extensions CREATE YOUR OWN ADVENTURE!
  • Page 35 BILL OF MATERIALS...
  • Page 40 in place...
  • Page 42 Gear crane extension - elevator final elevator assembly...
  • Page 43 FINAL ASSEMBLY/STRINGING GEAR CRANE Note: Cut the second string in half before you begin. You will need both halves. A. Axle Spool: Lifts lighter loads quickly. Tie the string around the middle of the Route the string up and over Bring the string down and attach it axle spool and activate the Axle Drive.

This manual is also suitable for:

04129