Installation; Wiring Procedure; Terminal Block - Patlite LU7-02 Installation Manual

Signal tower lu7 series

Advertisement

4. Installation

■ Mounting
● Drill mounting holes in the wall. (See the following installation diagram.)
● Secure the mounting bracket with the hex bolts and hex nuts.
 ● Install the Signal Tower vertically at a location that has sufficient strength and minimal
   vibration.
 ● The alarm of buzzer models can be heard best from the front direction.
   Therefore make sure the Signal Tower is facing the correct direction before install it.
Caution
● This product can be used only indoors. (Do not use it outdoors.)
● Do not install the Signal Tower horizontally or inverted.
  (See the following "Mounting side" .)
● Make sure of the specified operating voltage and current before use.
● Do not use or keep without LED unit or Head cover installed.
● Use the soft cloth with moisture when the LED unit or Bse unit must be
  cleaned up. (Do not use thinner, benzine, gasoline or oil.)
● During installation, do not remove the waterproof sheet. It may cause
  a malfunction of water proof structure.
● This product has 1mm thick waterproof packing at the bottom of the pole
  bracket. However, when complete waterproofing is not provided due to the
  unevenness of the installation surface, apply waterproof sealant between the
  unit and the installation surface to maintain waterproof conditions.
● When the cable gland is used, the hole must be the dimension that it can go
through. The cable which it can be used for is as follows;
Screw Size: M16×P1.5, Screw Length: Maximum 11mm,
Outer Diameter: Maximum 25mm, Material: Plastic.
[Mounting side]
VOL.
Upright

5. Wiring Procedure

■ Wiring procedure
(Concerning the mark ※, the conditions about the product corresponding to UL are mentioned.)
● Please make wiring connection according to wiring example.
For wiring of 5 layers or less, please make wiring connection by increasing or decreasing external contacts in each layer according
  to wiring example.
When using multiple LED units of the same color, make the contact capacity equal to the number of same color LED units multiplied
  by the contact capacity for 1 light. (This is because LED units of the same color light up for one signal line.)
Fuse for protection of external contact should be installed within 305mm from the connected point of the power source wire.
When wiring is completed, insulate the end of each unused lead wire by using insulation tape.
Use "Class Ⅱ Circuit" for the power supply source. Concerning fuse and fuse-holder, be sure to use the products authorized
  by UL Inc.
Use the fuse conforming to the rated current of the machine. ( Example : Class J type fuse )
For the 90∼250V AC model, connect the green/yellow lead wire to the ground.
If you have any questions about simultaneous use of multiple units or other special operations,
contact PATLITE Customer Service before wiring.
5-1. Wiring example for Base unit [Terminal block]
● Remove Body from Base unit.(In case of 24V type, refer to "6. Unit reformation" .)
● In case of 90-250V type, refer to "5-1-2. Wiring procedure for 90-250V type," Be sure to disengage the Screw before removing
the Body from Terminal block.

〔Terminal block〕

CN4:For high voltage
(90-250V type)
Tighten torque 0.6N・m
※ Recommendable wire type / dia:UL1015AWG18~14
※ Strip length of lead wires: 10mm
Invert
Horizontal
CN2:For signal and low voltage (24V type)
※ Strip length of lead wires: 9mm
Front
※Recommendable wire type / dia
※Use 75℃ CU Wire only.
Caution
● Never fail to observe the strip length of lead wire. Excessively short strip length causes
connection failure and excessively long strip length gives rise to electric shock or short
circuit, which are extremely dangerous.
● While wiring this product, take care to avoid short-circuits from loose wire strands or
similar conditions.
● Do not use unnecessarily strong force to separate the Terminal block and the Body.
Inside wiring may be damaged and may cause failure.
● Connect high-voltage power supply cable to the specified terminals in the Terminal block.
Failure to connect this cable correctly will burn out the internal circuit.
1. Confirm the hole position on the product.
2. Secure the template to the installation surface
3. Mark the installation holes using nail punch,
  etc.
4. Drill the holes in the installation surface.
Terminal
UL1007AWG22~16
UL1430AWG22~16
CN5:For Earth
( Tighten torque : 1.2N・m )
※ Recommendable wire type / dia:UL1015AWG18~14
※ Use the lead wire with the color of green or green/yellow for the earth wire.
-7-
Buzzer
transmission
direction
Installation
template
Name plate
Using this template
using adhesive tape.
※ Confirm the direction of the name plate and
the wiring route before you drill the holes.
Corresponding unit
Terminal
color
No.
or operation
1
Red
LED unit Red
2
Orange
LED unit Amber
Green
LED unit Green
3
4
Blue
LED unit Blue
5
White
LED unit White
Gray
Buzzer1:Pi...(Continuous)
6
Black
7
Buzzer2:Pi・Pi...
8
Yellow
Power supply(Continuous COM)
9
Gray
Flashing COM
Black
Power supply
10
Mounting hole
3-φ5
Unit:mm