Factoryfurniture SCROLL Operation & Maintenance Manual

Picnic set

Advertisement

Quick Links

SCROLL Picnic Set
Operation & Maintenance Manual
Factory Furniture Ltd
|
The Stableyard
|
Coleshill
|
Swindon SN6 7PT
|
T +44 (0)1793 763829
|
F +44 (0)1793 861615
hello@factoryfurniture.co.uk
|
www.factoryfurniture.co.uk
We reserve the right to change specification without notice. © 2016 Factory Furniture Ltd

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SCROLL and is the answer not in the manual?

Questions and answers

Summary of Contents for Factoryfurniture SCROLL

  • Page 1 SCROLL Picnic Set Operation & Maintenance Manual Factory Furniture Ltd The Stableyard Coleshill Swindon SN6 7PT T +44 (0)1793 763829 F +44 (0)1793 861615 hello@factoryfurniture.co.uk www.factoryfurniture.co.uk We reserve the right to change specification without notice. © 2016 Factory Furniture Ltd...
  • Page 2 Stainless Steel (polished stainless steel only) Clean as required, but at least every three months, using a stainless steel polish and a lint free cloth. To remove ground in dirt, a stainless steel finishing pad may be required. SCROLL PICNIC SET specification...
  • Page 3 PART DETAIL DRAWINGS FF2010 / 04 SCROLL PICNIC SET SETTING OUT DRAWINGS Contacts Factory Furniture Ltd, The Stableyard, Coleshill, Swindon. Wiltshire SN6 7PT U.K. Tel +44 (0) 1793 763829 Fax +44 (0) 1793 861615 Email hello@factoryfurniture.co.uk Web www.factoryfurniture.co.uk SCROLL PICNIC SET repairs...
  • Page 4 2. Carefully pour concrete for each pad. Check table and benches are level and maintain at correct height and vertical until concrete sets (at least 24 hours). IMPORTANT NOTE: Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on stainless steel components. SCROLL PICNIC SET installation...

Table of Contents